Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
air-source heat pump water acceptance processes construction phase final acceptance system introductionthis standard deck leaks low-sodium salt occupational acute ammonia
NB/T 34067-2018 in English

NB/T 34067-2018 in English

VALID

Specification for construction and acceptance of air-source heat pump water heating system

  • Issued on:2018-06-06
  • Implemented on:2018-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $160.00
$156.00


Introduction

This standard provides detailed guidelines for the construction and acceptance processes of air-source heat pump water heating systems. It outlines the necessary procedures, technical requirements, and quality control measures to ensure the proper installation and operation of these systems. The document covers various aspects including site preparation, equipment installation, electrical connections, and system testing. It also specifies the documentation and inspection criteria that must be followed during the construction phase. Additionally, the standard defines the conditions and methods for system commissioning and final acceptance. The content is structured to support both practitioners and regulatory bodies in maintaining consistent and high-quality standards throughout the project lifecycle.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of NB/T 34067-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • NB/T 11238-2023 in English

    NB/T 11238-2023 in English

    Specification for operation and maintenance management of air-source heat pump heating system

    2023-05-26
  • NB/T 20399-2017 in English

    NB/T 20399-2017 in English

    Secification for nuclear safety-related concrete structures construction and acceptance in PWR nuclear power plant

    2017-02-10
  • NB/T 20005.14-2019 in English

    NB/T 20005.14-2019 in English

    Carbon steel and low alloy steel for pressurized water reactor nuclear power plants. Part 14: Class 2 and 3 butt-welding seamless fittings

    2019-12-30
  • NB/T 11111-2023 in English

    NB/T 11111-2023 in English

    Specification for feasibility evaluation of coal geological exploration

    2023-02-06
  • NB/T 10284-2019 in English

    NB/T 10284-2019 in English

    Performance requirements and test methods of SPD multi-functional monitoring devices

    2019-11-04
  • NB/T 25060-2016 in English

    NB/T 25060-2016 in English

    Technical specification of cold workshops for PWR nuclear power plant

    2016-08-16
  • NB/T 31017-2018 in English

    NB/T 31017-2018 in English

    Technical specification for main control system of double fed wind turbine generator

    2018-06-06
  • NB/T 20259.4-2021 in English

    NB/T 20259.4-2021 in English

    Code of valuation on bill of quantities of nuclear power plant construction works—Part 4: Ventilation and air conditioning equipment installation

    2021-01-07
  • NB/T 47011-2022 in English

    NB/T 47011-2022 in English

    Zirconium pressure vessel

    2022-11-04
  • NB/T 10524-2021 in English

    NB/T 10524-2021 in English

    Experimental test method for shearers-scraper convepers-hydraulic supports matched performance in fully mechanized mining face

    2021-01-07