NB/T 42017-2013 in English
VALIDReciprocating Internal Combustion Gas Turbine Power and Fuel Consumption Rate Conversion Method
- Issued on:2013-11-28
- Implemented on:2014-04-01
- File Format:PDF
- Delivery:Via email within 5 business days
$524.00
Scope
This standard specifies the calculation method of gas generator power correction, gas generator power adjustment and fuel consumption rate conversion method. This standard applies to reciprocating internal combustion gas generator sets, and the supporting engines are gas engines (hereinafter referred to as engines).

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

NB/Z 20256-2013 in English
Code for seismic design of structures related to nuclear safety
2013-06-08 -

NB/T 20713-2024 in English
Guidelines for Corrosion Control of Nuclear Power Plant Equipment
2024-05-24 -

NB/T 20216-2024 in English
Technical specification for installation of nuclear auxiliary system piping in pressurized water reactor nuclear power plants
2024-09-24 -

NB/Z 20253-2013 in English
System Cleaning During Installation/Commissioning of PWR Nuclear Power Plant
2013-06-08