Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
meteorological construction project management construction project management meteorological construction project introduction background meteorological project management towards million national meteorological engineering construction financial statements high-speed duplicate audio tape scopethis standard supplement industrial mineral oil
QX/T 31-2018 in English

QX/T 31-2018 in English

VALID

Specifications for assessing and accepting the completed meteorological construction project

  • Issued on:2018-12-12
  • Implemented on:2019-04-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $230.00
$224.00
Standard No: QX/T 31-2018
Document status: VALID
Title in English: Specifications for assessing and accepting the completed meteorological construction project
Title in Chinese: 气象建设项目竣工验收规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-12-12
Implemented on: 2019-04-01
Superseding: QX/T 31-2005 Specification for assessing and accepting the completed meteorological construction project
ICS Classification: 07.060-Geology. Meteorology. Hydrology
Chinese Classification: A47-Meteorology
Professional Classification: QX-Meteorology
Related Keywords: meteorological construction project management
construction project management
meteorological construction project introduction background
meteorological project management towards
million national meteorological engineering construction financial statements
Related Topics: construction project
Project acceptance test
Atmospheric Items
project charges
Thirteenth Five-Year Construction Project
approved items
Temporary environmental protection acceptance of construction projects
construction project
completed
Acceptance project system
Item acceptance method
Gas engineering project
Construction project completion environmental protection acceptance management regulations
Completion acceptance
Fraudulent environmental protection acceptance of completed construction projects
Cyberspace Administration of China project acceptance
Special cleaning and acceptance of electrical equipment
Robot project acceptance
Environmental Protection Completion Acceptance Agreement
Construction of standard meteorological field
Meteorological field construction standards
Biomass project engineering acceptance
Completion acceptance of electrolytic aluminum project


Introduction

Background and Significance of the Standard Revision

QX/T31-2018, a key standard for meteorological construction project management, responds to the updated requirements of GB/T50326-2017, "Code for Construction Project Management," and implements the new provisions on final financial statements upon completion (Document Caijian [2016] No. 503) issued by the Ministry of Finance. Compared to the 2005 edition, 12 substantive revisions, including the elimination of pre-acceptance steps, optimization of acceptance procedures, and strengthening of financial oversight, reflect the shift in meteorological project management towards refined management and comprehensive process control.


Analysis of Core Terminology Definitions

Terminology Key Definitions Application Scenarios
Large and Medium-sized Projects Total Investment ≥ RMB 30 Million National Meteorological Engineering Construction
Financial Statements after Completion Includes all costs of construction projects/equipment purchases/technology development, etc. Asset Transfer and Investment Benefit Analysis
Single Item Acceptance Independent Subsystem Acceptance Complex projects implemented in phases

Acceptance Content and Technical Requirements

Key Implementation Points for Clauses 3.1-3.10

Quality Verification: A third-party inspection report is required. For business-related projects, the trial run period must be no less than 90 days. For example, for a provincial meteorological big data center project, server load test data and business continuity drill records must be submitted.

Archives Management: Archives must be organized in accordance with the "Standards for the Composition of Scientific and Technological Archives," including 28 types of materials, such as bidding documents and supervision logs.


Organizational mechanism for graded acceptance

  • National acceptance: Projects with a value of more than 30 million yuan are directly organized by the National Development and Reform Commission/the Ministry of Finance
  • Provincial acceptance: Projects with a value of 10-30 million yuan are led by the Planning and Finance Department of the Provincial Meteorological Bureau
  • Special circumstances: Confidential projects require an additional special acceptance link for confidentiality

Special requirements for financial final accounts

According to Chapter 8, the final account report must include:
Fund flow tracking sheet (accurate to the contract payment node)
Asset detailed list (including depreciation calculation for special equipment such as automatic weather stations)
• Investment deviation analysis (±5% estimate fluctuation is allowed)


Comparative analysis of new and old standards

File transfer No classification requirements Three-level archiving of ministry/province/city

Implementation suggestions and risk prevention and control

  1. Pre-audit: It is recommended to initiate the final audit 90 days before the formal acceptance
  2. Digital acceptance: Establish an electronic archive to achieve QR code traceability of equipment such as sounding radar
  3. Common problems: Avoid five common defects such as missing payment vouchers and incomplete trial operation records

Sample only — not a preview of QX/T 31-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend