QX/T 31-2018 in English
VALIDSpecifications for assessing and accepting the completed meteorological construction project
- Issued on:2018-12-12
- Implemented on:2019-04-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$224.00
Introduction
Background and Significance of the Standard Revision
QX/T31-2018, a key standard for meteorological construction project management, responds to the updated requirements of GB/T50326-2017, "Code for Construction Project Management," and implements the new provisions on final financial statements upon completion (Document Caijian [2016] No. 503) issued by the Ministry of Finance. Compared to the 2005 edition, 12 substantive revisions, including the elimination of pre-acceptance steps, optimization of acceptance procedures, and strengthening of financial oversight, reflect the shift in meteorological project management towards refined management and comprehensive process control.
Analysis of Core Terminology Definitions
| Terminology | Key Definitions | Application Scenarios |
|---|---|---|
| Large and Medium-sized Projects | Total Investment ≥ RMB 30 Million | National Meteorological Engineering Construction |
| Financial Statements after Completion | Includes all costs of construction projects/equipment purchases/technology development, etc. | Asset Transfer and Investment Benefit Analysis |
| Single Item Acceptance | Independent Subsystem Acceptance | Complex projects implemented in phases |
Acceptance Content and Technical Requirements
Key Implementation Points for Clauses 3.1-3.10
Quality Verification: A third-party inspection report is required. For business-related projects, the trial run period must be no less than 90 days. For example, for a provincial meteorological big data center project, server load test data and business continuity drill records must be submitted.
Archives Management: Archives must be organized in accordance with the "Standards for the Composition of Scientific and Technological Archives," including 28 types of materials, such as bidding documents and supervision logs.
Organizational mechanism for graded acceptance
- National acceptance: Projects with a value of more than 30 million yuan are directly organized by the National Development and Reform Commission/the Ministry of Finance
- Provincial acceptance: Projects with a value of 10-30 million yuan are led by the Planning and Finance Department of the Provincial Meteorological Bureau
- Special circumstances: Confidential projects require an additional special acceptance link for confidentiality
Special requirements for financial final accounts
According to Chapter 8, the final account report must include:
• Fund flow tracking sheet (accurate to the contract payment node)
• Asset detailed list (including depreciation calculation for special equipment such as automatic weather stations)
• Investment deviation analysis (±5% estimate fluctuation is allowed)
Comparative analysis of new and old standards
| File transfer | No classification requirements | Three-level archiving of ministry/province/city |
Implementation suggestions and risk prevention and control
- Pre-audit: It is recommended to initiate the final audit 90 days before the formal acceptance
- Digital acceptance: Establish an electronic archive to achieve QR code traceability of equipment such as sounding radar
- Common problems: Avoid five common defects such as missing payment vouchers and incomplete trial operation records

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

QX/T 705-2023 in English
Technical Specifications for Division of Lightning-prone Areas
2023-12-30 -

QX/T 712-2024 in English
Climate Change Impact Assessment Food Crop Yield Vulnerability
2024-06-20 -

QX/T 317-2023 in English
General rules for quality assessment of lightning protection device testing
2023-09-05 -

QX/T 69-2024 in English
Aerosol optical depth Sun photometer method
2024-08-16 -

QX/T 41-2022 in English
air quality forecast
2022-01-07 -

QX/T 105-2009 in English
Code for supervision and acceptance of construction quality of lightning protection system
2009-06-07 -

QX/T 257-2015 in English
Calibration method of hair hygrometer(hygrograph)
2015-01-26