SC/T 8317-2025 in English
VALIDFishing boat life-saving grade maintenance technical regulations
- Issued on:2025-01-09
- Implemented on:2025-05-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$161.00
| Standard No: | SC/T 8317-2025 |
| Document status: | VALID |
| Title in English: | Fishing boat life-saving grade maintenance technical regulations |
| Title in Chinese: | 渔船救生筏检修技术规程 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2025-01-09 |
| Implemented on: | 2025-05-01 |
| ICS Classification: | 65.150-Fishing and fish breeding |
| Chinese Classification: | B94-Fishery machinery and tools |
| Professional Classification: | SC-Aquaculture |
| Related Keywords: | unpacking inspection → system maintenance → verification test → packaging
life-saving grade maintenance key technical requirements maintenance items old version requirements key maintenance items dynamic load test implementation suggestions maintenance cycle management |
Introduction
Interpretation of the core content of the standard
SC/T 8317-2025 establishes a standardized maintenance process including 8 key processes: from certificate verification → unpacking inspection → system maintenance → verification test → packaging and archiving, forming a closed-loop quality management system. The standard particularly emphasizes the two core indicators of throwable inflatable life raft: airtightness maintenance and integrity of emergency functions.
Comparison of key technical requirements
| Maintenance items | Old version requirements | 2025 version new regulations |
|---|---|---|
| Float tire repair standard | Damage area ≤100cm² | ≤150cm² and length ≤80cm |
| Cylinder gas volume deviation | Allow ±30g | Negative deviation ≤20g |
| Safety valve test | Visual inspection | Neutral soap solution sealing test |
Detailed explanation of key maintenance items
1. Maintenance of the charging system
The standard requires a six-step inspection of the quick release valve: including water corrosion inspection, safety device integrity verification, shaft core striker deformation inspection, etc. When inspecting the cylinder, an electronic scale with a graduation value of ≤5g should be used to weigh the gas to ensure that the CO₂/N₂ mixing ratio meets the original manufacturer's requirements.
2. Verification test system
Establish a four-level test system:
- WP air tightness test: pressure drop of ≤5% in 1 hour
- GI inflation test: inflation and molding are completed within 1 minute
- NAP additional pressure test: 2 times the working pressure is maintained for 5 minutes
- FS raft bottom strength test: 82.5kg dynamic load test
Implementation suggestions
Maintenance cycle management
It is recommended to establish a dual-track archive system: paper maintenance records (kept for 5 years) and electronic ledgers are maintained simultaneously. For life rafts with a 25-year service life, the full set of GI+NAP+FS tests must be performed in the 10th/15th/20th/25th year.
Common Problem Solving
When the canopy column safety valve is found to be leaking, the following should be checked first: ① The debonding condition of the valve body joint ② The rust condition of the spring ③ The aging degree of the rubber seal. The standard clearly stipulates that only 1 bubble is allowed to appear within 5 minutes during the sealing test.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SC/T 7003-2025 in English
General Technical Specifications for Vertical Fish Finder
2025-04-27