Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
process plant layout plant layout general layout plan layout pipeline layout pork scopethis standard compulsory education export一 park
SH 3011-2011 in English

SH 3011-2011 in English

VALID

Specification for Design of Process Plant Layout in Petrochemical Engineering

  • Issued on:2011-05-18
  • Implemented on:2011-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: SH 3011-2011
Document status: VALID
Title in English: Specification for Design of Process Plant Layout in Petrochemical Engineering
Title in Chinese: 石油化工工艺装置布置设计规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2011-05-18
Implemented on: 2011-06-01
Superseding: SH 3011-2000 General rule of process plant layout design for petrochemical industry
ICS Classification: 91.010-Construction industry
Chinese Classification: P72-Petrochemical and chemical industry engineering
Professional Classification: SH-Petrochemical
Related Keywords: process plant layout
plant layout
general layout
plan layout
pipeline layout
Related Topics: Power design of petrochemical plant
Petrochemical and Chemical
chemical process
chemical process
chemical plant equipment
chemical plant equipment
Power design of petrochemical production equipment
sh3011-2011
sh3011
sh+3011
PetroChina Design
fabric design
Device Industrial Design
Analytical device industrial design
Petrochemical plant layout design
Layout design of petrochemical process equipment
Layout design of petrochemical metal pipelines
Lightning protection design for petrochemical plant
Preaction device design
Petrochemical plant layout design
Process Design of Petrochemical Wharf Loading and Unloading
Process layout
Layout design of petrochemical factory
Petrochemical Equipment Design Selection Manual
Process design of safety pressure relief facilities for petrochemical plants
"Chemical Plant Equipment Layout Design Engineering Regulations" HG20546-2009
Safety design of calcium carbide device
Petrochemical dcs design
Safety Design Code for Calcium Carbide Devices
Location of electric heat tracing in petrochemical pipelines
Petrochemical plant telecommunications design
Chemical fiber cloth production process standards
Execute foreign chemical plant engineering design
Chemical process organic waste disposal device technology
Petrochemical plant cables
Design of emergency isolation control valve for fire in petrochemical plant
Petrochemical design safety inspection
Petrochemical telecommunications design specification version
Establishment of standards for ferroalloy process and equipment design specifications
National standard chemical plant equipment layout design regulations
Packaging design specifications and design standardization
Petrochemical powder engineering design
Petrochemical design safety
Engineering design of mechanical pumps for petrochemical industry
Standard design of relay room settings
Standard design requirements for relay room settings
Chemical plant one-way valve settings
Petrochemical plant benzene series
Chemical production unit capacity design
Basis for construction of process treatment team
sh 3011-2011
Petrochemical equipment installation specifications and
Petrochemical pool design


1 Scope

This specification specifies requirements for design of process plant layout in petrochemical engineering.
This specification is applicable to design of construction, expansion and renovation of process plant layout in petrochemical engineering.

2 Normative References

The following normative documents contain provisions which, through reference in this specification, constitute provisions of this specification. For dated reference, subsequent amendments to, or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this specification are encouraged to study whether the latest editions of these documents are applicable. For undated references, the latest edition of the normative document referred to applies.
GB 16297 Integrated Emission Standards of Air Pollutants
GB 50058 Electrical Installations Design Code for Explosive Atmospheres and Fire Hazard
GB 50160 Fire Prevention Code of Petrochemical Enterprise Design
SH/T 3055 Design Specification for Pipe Supports in Petrochemical Engineering
SH/T 3146 Design Specification for Noise Control in Petrochemical Industry

3 General Requirements

3.0.1 The plant layout shall meet the following requirements:
a) Process flow;
b) Safe production;
c) Environmental protection;
d) General layout in the factory;
e) Operation, maintenance, overhaul, construction and fire fighting;
f) Reasonable land use and energy consumption reduction.
3.0.2 Plant layout shall be determined according to the plant position in the general plan of the factory and the relative positions of plant, tank field, system pipe rack and road related to the plant and shall be coordinated with the layout of adjacent plants.
3.0.3 The layout of equipment, buildings and structures in the plant shall meet the following principles:
a) Relative position of equipment and building shall be determined according to perennial frequency wind direction;
b) The equipments restricted by process characteristics or natural conditions may be arranged in buildings.
c) Relation of relative elevation and absolute elevation of the plant over the ground shall be determined according to vertical layout of the plant;
d) The equipments of large load and vibrated equipment shall be arranged reasonably based on the geologic condition;
e) The equipments, buildings and structures should be arranged at one same ground level; when limited by topography, the control room, cabinet room, distribution substation and power substation, laboratory and office shall be arranged at higher ground level; and the process equipment and plant tanks should be arranged at lower ground level.
3.0.4 Equipments shall be arranged in the principle of proper concentration of the process flow order and the same kind of equipments; the equipments should be arranged at both sides of the pipe rack according to the flow order; the equipment for treating corrosive, toxic and sticky materials should be arranged in a centralized manner in accordance with the physical property.
3.0.5 Fire separation of plan layout of equipment and building shall meet the relevant requirements of the current national standard GB 50160.
3.0.6 Layout of electrically-driven equipments and electrical equipments shall meet the relevant requirements of current national standard GB 50058.
3.0.7 Equipments with noise should be arranged far away from the densely-populated locations and the noise control shall meet the relevant requirements of current national standard SH/T.
3.0.8 Equipments, buildings and structures shall be arranged by zone in accordance with production feature and fire hazard category. The relevant equipments with process requirements may be arranged closely to prevent coking and blocking, control the temperature drop and pressure drop and avoid side reaction, etc.
3.0.9 The roof condenser, bottom reboiler may be directly connected to or placed close to the fractionating tower; the liquid separation tank, buffer tank and intercooler of may be directly connected or placed close to the compressor; moreover, other equipments closely related to the main equipment may be directly connected to or placed close to the main equipment.
3.0.10 Equipments generating harmful gas, dust, effluvial material and radioactive substances should be placed far away from the densely-populated area and shall meet the requirements for environmental protection.
3.0.11 The equipments should be placed in the open air or in the semi-open air and reduce the range of explosion danger zones. The range of explosion danger zones shall meet the relevant requirements of current national standard GB 50058.
3.0.12 The spacing between the equipments shall not only comply with requirements for fire protection and explosion protection but shall meet the following requirements:
a) Site and passage required by operation, overhaul, handling and hoisting;
b) Layout of ladders and platforms;
c) Layout of equipment foundation, underground-embedded pipeline, pipe ditch, cable trench and drainage well;
d) Installation of pipeline and instrument.
3.0.13 If the plant is required to be constructed by phase or reserved for development land, the position of the reservation area shall be determined according to the requirements for the general layout of the factory, production nature and the equipment feature.
3.0.14 The layout of equipment in vertical surface shall meet the following requirements:
a) Equipment not required to be elevated by the process flow should be grounded;
b) Tower and vessel pumped by pumps and such equipments as vacuum, gravity flow and solid discharging shall be placed at an appropriate high-rise position in accordance with the requirements of process flow;
c) Equipments may be placed on the structure due to the restricted area of the plant or economic rationality.
3.0.15 The equipment foundation elevation and position and elevation of underground solution vessel shall be determined in combination with vertical layout and pipeline layout of the plant.
3.0.16 The foundation of underground portion shall be determined in such a way not to exceed boundary line of the plant during the determination of position of equipments and buildings and structures.
3.0.17 Overhaul site for equipments at tower area and multilayer structure shall be paved.
3.0.18 During the operation or overhaul, the areas possible to be polluted by the combustible liquid, corrosive medium or the toxic materials shall be set up with cofferdam; the equipment area for treating the corrosive medium shall be paved with anti-corrosion ground. The setting of the cofferdam shall meet the following requirements:

Foreword I
1 Scope
2 Normative References
3 General Requirements
4 Layout of Pipe Rack
4.1 Type and Position of Pipe Rack
4.2 Requirements for Layout of Pipe Rack
5 Layout of Common Equipments
5.1 Layout of Tower and Vertical Vessel
5.2 Layout of Reactor
5.3 Layout of Tubular Heat Exchangers
5.4 Layout of Reboiler
5.5 Layout of Air Cooler
5.6 Layout of Heater
5.7 Layout of Horizontal Vessel
5.8 Layout of Plant Tank (Group)
5.9 Layout of Pump
5.10 Layout of Compressor
6 Layout of Buildings and Structures
6.1 Layout of Building
6.2 Layout of Structure
6.3 Layout of Platform and Ladder
7 Layout of Passage
7.1 General Requirements
7.2 Arrangement of Passage
Explanation of Wording

Sample only — not a preview of SH 3011-2011
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend