Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
petrochemical industry project scopethese regulations construction completion petrochemical projects petrochemical units construction unit hydraulic mechanical auxiliary equipment system low elasticity yarns hybrid electricity
SH 3503-2001 in English

SH 3503-2001 in English

SUPERSEDED

Regulation of Technical Document for Construction Completion of Petrochemical Industry Project

  • Issued on:-
  • Implemented on:2002-05-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $360.00
$350.00
Standard No: SH 3503-2001
Document status: SUPERSEDED
Superseded by: SH/T 3503-2007 Regulation of technical document for construction completion of petrochemical industry project
Superseded on: 2008-05-01
Title in English: Regulation of Technical Document for Construction Completion of Petrochemical Industry Project
Title in Chinese: 石油化工工程建设交工技术文件规定
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Implemented on: 2002-05-01
Professional Classification: SH-Petrochemical
Related Keywords: petrochemical industry project scopethese regulations
construction completion
petrochemical projects
petrochemical units
construction unit
Related Topics: Petrochemical
technology sh
Oil and Gas Engineering Technology
Construction
Construction
petrochemical technology
Petrochemical Monitoring
Chemical Equipment Regulations
document requirements
Technical standards for inter-pipeline engineering in petrochemical plants.
Quality inspection and assessment of petrochemical equipment installation engineering
Construction Technical Regulations for Petrochemical Equipment
Petrochemical Engineering
Construction Technical Regulations for Thermal Insulation Engineering in Petrochemical Industry
GBT 50484-2019 Construction safety technology for petrochemical construction projects
High-altitude working technology in petrochemical engineering
Petrochemical dcs design
Petrochemical Equipment Safety Assessment Technology
What are the technical specifications for petrochemical construction?
Petrochemical powder engineering design
Engineering design of mechanical pumps for petrochemical industry
Petrochemical Interplant Pipeline Engineering Technology
Petrochemical Engineering International
Petrochemical Engineering Anti-seepage Technology
Petrochemical oil blending facility technology


Scope

These regulations apply to the construction, expansion and reconstruction of oil refining, petrochemical production units (hereinafter referred to as petrochemical units) and their supporting facilities. The content and format of the handover documents for railways, highways, ports and terminals, telecommunications projects, power transmission and transformation projects above 3kV, industrial elevators, and projects involving oil fields, long-distance pipelines and urban construction in the construction of petrochemical projects shall be implemented in accordance with the relevant industry standards or regulations of relevant departments. The content and format of the handover documents used for industrial buildings and structures in petrochemical projects, in addition to the exceptions listed in these regulations, shall also be implemented in accordance with national standards and relevant industry standards or regulations of the construction administrative department of the project location. The handover documents for boiler installation, on-site assembly and welding of pressure vessels and special equipment installation projects shall be implemented in accordance with the content and format approved by the boiler pressure vessel and special equipment safety supervision agency in the construction unit's location.

Sample only — not a preview of SH 3503-2001
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend