Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
unit reaction regeneration system equipment construction technology reactor-regenerator system equipment reaction regeneration system equipment unit scopethis regulation bleached shellac scopethis standard electromagnetic pulley-technical requirements scopethis standard traditional culture method pcr-test strip method detection target colony
SH/T 3601-2009 in English

SH/T 3601-2009 in English

VALID

Regulation for construction technology of reactor-regenerator system equipment of catalytic cracking unit

  • Issued on:2009-12-04
  • Implemented on:2010-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $400.00
$388.00

本规程规定了催化裂化装置反应再生系统设备工厂化制造过程、现场组焊过程控制的施工技术和质量要求。
本规程适用于石油化工工建设工程新建、扩建和改建项目催化裂化装置反应再生系统设备的施工。


Scope

This regulation stipulates the construction technology and quality requirements for process control such as factory manufacturing, on-site assembly and welding, installation, and inspection of catalytic cracking unit reaction regeneration system equipment. This procedure is applicable to the construction of reaction regeneration system equipment of catalytic cracking units in new, expanded and renovated petrochemical construction projects.

Sample only — not a preview of SH/T 3601-2009
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.