SL 22-2011 in English
ABOLISHEDthe guideline of development plan of electrical power in the region mainly supplied by rural hydropower
- Issued on:2011-07-07
- Implemented on:2011-10-07
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$720.00
$699.00
$699.00
| Standard No: | SL 22-2011 |
| Document status: | ABOLISHED |
| Title in English: | the guideline of development plan of electrical power in the region mainly supplied by rural hydropower |
| Title in Chinese: | 农村水电供电区电力发展规划导则 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2011-07-07 |
| Implemented on: | 2011-10-07 |
| Professional Classification: | SL-Water Resources |
| Related Keywords: | power development
power development plans rural hydropower supply areas rural hydropower introductionthis document development plan |
| Related Topics: | sl 532 2011
power development Power Show+ development plan 14th Five-Year Rural Planning Great development of power grid The 14th Five-Year Plan for Rural Areas The difference between hydrogen conductivity and specific conductance Rural tap water testing Rural river water quality Rural Green Small Hydropower |
本标准适用于农村水电供电区县及跨县的地区农村水电供电区电力发展规划。
Introduction
This document provides guidance on the development of power planning in rural hydropower supply areas. It outlines the principles, methods, and procedures for formulating power development plans, taking into account the characteristics of rural hydropower supply areas and the needs of local electricity demand. The content covers aspects such as resource investigation, load forecasting, power supply scheme design, and implementation plan formulation. It also includes requirements for the coordination between power development and other related sectors, as well as considerations for environmental protection and sustainable development. This document serves as a reference for relevant departments and units involved in the planning and management of rural hydropower supply areas.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of SL 22-2011

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28 -

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08