Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
design code periodic flushing desilting basin desilting basin non-flushing desilting basin water conservancy project annex d hydraulic calculation electric horn chloramphenicol residues manganese method covering products
SL 269-2001 in English

SL 269-2001 in English

SUPERSEDED

Design code for desiliting basin of water conservancy and hydropower projects

  • Issued on:2001-07-19
  • Implemented on:2001-12-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $270.00
$262.00
Standard No: SL 269-2001
Document status: SUPERSEDED
Superseded by: SL/T 269-2019 Design specification for desilting basins of water and hydropower projects
Superseded on: 2019-12-30
Title in English: Design code for desiliting basin of water conservancy and hydropower projects
Title in Chinese: 水利水电工程沉沙池设计规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2001-07-19
Implemented on: 2001-12-01
Chinese Classification: P55-Water conservancy and water power engineering in general
Professional Classification: SL-Water Resources
Related Keywords: design code
periodic flushing desilting basin
desilting basin
non-flushing desilting basin
water conservancy project annex d hydraulic calculation
Related Topics: water conservancy
hydropower project
Hydrodynamic water battery
Hydrodynamic water battery
Secondary Wiring Design of Water Conservancy and Hydropower Projects
Sample cell design
Sample cell design
Secondary sedimentation tank equipment
Secondary sedimentation tank equipment
Water Resources and Hydropower Engineering
Water Conservancy and Hydropower Engineering Safety Monitoring Design
Water Conservancy and Hydropower Design Estimates
Grounding Design of Water Conservancy and Hydropower Projects
dl/t5113.1-2019 Hydropower and Water Conservancy Capital Construction Project
Specification for kinetic energy design of hydropower projects NB/T 35061-2015
"Cable Design Code for Water Conservancy and Hydropower Engineering" sl 344
Fire protection in water conservancy and hydropower projects
Fire protection design of water conservancy and hydropower projects
Water conservancy and hydropower engineering automation design
Energy-saving design of water conservancy and hydropower projects
Design of sedimentation tank for water conservancy and hydropower projects
Deflection value design specifications and testing
Drinking water pool design
Relay protection design for water conservancy and hydropower projects
Design of pressure steel pipes for water conservancy and hydropower projects
Water conservancy and hydropower engineering design fire protection


1 General Provisions

1.0.1 This code is developed with a view to unifying technical criteria on design of desilting basin in diversion structure of water conservancy and hydropower project, ensuring design quality and promoting the engineering development of the desilting basin.

1.0.2 This code is applicable to the design of Grade 3 desilting basin or above for treatment of suspended sediment in large and medium-sized water conservancy and hydropower projects.

1.0.3 In the design of the desilting basin, the basic data analysis shall be properly carried out. For important projects, combined method of theoretical analysis and model test is applied to determine the main arrangement dimension of the desilting basin.

1.0.4 For the arrangement and design of the desilting basin, technical and economical comparison must be carried out.

1.0.5 For the desilting basin, operation design shall be carried out and shall be consistent with the operation of the hydroproject.

1.0.6 In the design of the desilting basin, sediment prototype observation and safety monitoring designs shall be proposed.

1.0.7 The design of the desilting basin shall not only comply with this code, but also shall meet those specified in the relevant current national and professional standards.

2 Terms and Main Symbols

2.1 Terms

2.1.1 desilting basin

the structure used to settle the suspended sediment whose sediment particle in sediment-laden flow is greater than the design settling diameter and reduce the sediment concentration in water flow

it may be classified into hydraulic flushing desilting basin and non-flushing desilting basin according to operation modes. The former may be sub-classified into continuous flushing desilting basin and periodic flushing desilting basin

2.1.2 continuous flushing desilting basin

the desilting basin that continuously flushes the settled sediment into the downstream watercourse during continuous water supply. The continuous flushing desilting basin consists of upstream connection section, working section, downstream connection section and flush gallery, as shown in Figures 2.1.2-1 and 2.1.2-2

Foreword i
1 General Provisions
2 Terms and Main Symbols
3 Design Data
4 Arrangement Conditions of Desilting Basin and Design Criteria of Sediment Settlement
5 Selection of Position and Type
6 Project Arrangement
7 Determination of Main Dimension
8 Structural Design
9 Operation Design
10 Prototype Observation and Safety Monitoring Design
Annex A Settlement Calculation Method
Annex B Settling Velocity Calculation of Suspended Sediment
Annex C Flushing Calculation of Periodic Flushing Desilting Basin for Water Conservancy Project
Annex D Hydraulic Calculation for Pressure and Non-pressure Sediment Flushing of Desilting Basin at Hydropower Station
Explanation of Wording in this Code

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend