SL 357-2006 in English
VALIDCode of feasibility study report of rural hydropower station
- Issued on:2007-02-02
- Implemented on:2007-05-02
- File Format:PDF
- Delivery:Via email within 5 business days
Price(USD):
$750.00
$728.00
$728.00
Scope
This standard is applicable to rural hydropower stations with an installed capacity of 5 to 50MW. Rural hydropower stations with an installed capacity of less than 5MW can be appropriately simplified by referring to this standard; rural hydropower stations that have been renovated or expanded can be implemented by reference.
Sample only — not a preview of SL 357-2006

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 160-2012 in English
Regulation for hydraulic and thermal model in cooling water projects
2012-07-13 -

SL 222-2013 in English
Design guidelines of power system for rural regions supplied with hydropower
2013-10-28 -

SL 223-1999 in English
Specification of construction acceptance on water resources and hydroelectric development
1999-03-19