Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
third-level concrete face rockfill dams fifth-level concrete face rockfill dams rockfill dams scopethis specification construction specification dams piping tape introductionthis standard machine taps treponema pallidum antibodies
SL 49-1994 in English

SL 49-1994 in English

SUPERSEDED

Construction specification for concrete faced rockfill dams

  • Issued on:1994-03-31
  • Implemented on:1994-07-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $750.00
$728.00

本规范适用于一、二、三级混凝土面板堆石坝(含砂砾石填筑的坝)的施工。四、五级混凝土面板堆石坝施工,可参照执行。对于坝高超过70m的混凝土面板堆石坝,不论工程等级均应按本规范执行。


Scope

This specification is applicable to the construction of first-, second- and third-level concrete face rockfill dams (dams filled with sand and gravel). The construction of fourth- and fifth-level concrete face rockfill dams can be implemented as a reference.

Sample only — not a preview of SL 49-1994
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend