SL 49-1994 in English
SUPERSEDEDConstruction specification for concrete faced rockfill dams
- Issued on:1994-03-31
- Implemented on:1994-07-01
- File Format:PDF
- Delivery:Via email within 5 business days
Price(USD):
$750.00
$728.00
$728.00
本规范适用于一、二、三级混凝土面板堆石坝(含砂砾石填筑的坝)的施工。四、五级混凝土面板堆石坝施工,可参照执行。对于坝高超过70m的混凝土面板堆石坝,不论工程等级均应按本规范执行。
Scope
This specification is applicable to the construction of first-, second- and third-level concrete face rockfill dams (dams filled with sand and gravel). The construction of fourth- and fifth-level concrete face rockfill dams can be implemented as a reference.
Sample only — not a preview of SL 49-1994

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 160-2012 in English
Regulation for hydraulic and thermal model in cooling water projects
2012-07-13 -

SL 222-2013 in English
Design guidelines of power system for rural regions supplied with hydropower
2013-10-28 -

SL 5-1995 in English
Economic evaluation code for small hydropower projects
-