SL 601-2013 in English
VALIDTechnical Specification for Concrete Dam Safety Monitoring
- Issued on:2013-03-15
- Implemented on:2013-06-15
- File Format:PDF
- Delivery:Via email within 1~3 business days
$1,892.00
| Standard No: | SL 601-2013 |
| Document status: | VALID |
| Title in English: | Technical Specification for Concrete Dam Safety Monitoring |
| Title in Chinese: | 混凝土坝安全监测技术规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2013-03-15 |
| Implemented on: | 2013-06-15 |
| Professional Classification: | SL-Water Resources |
| Related Keywords: | concrete dam safety monitoring scope1.0.1
dam safety safety monitoring safety monitoring methods dam body |
| Related Topics: | safety inspection
Safety Detection Technology in601 concrete dam Mixed Phase Pressure Measurement Technology sl601-2013 |
本标准适用于水利水电工程等级划分及设计标准中的1级、2级、3级、4级混凝土坝的安全监测,5级混凝土可参照执行。
Scope
1.0.1 This standard is formulated to standardize the safety monitoring of concrete dams, grasp the operating performance of the dam, guide the construction and operation of the project, provide feedback on the design, and reduce the risk of the dam. 1.0.2 This standard is applicable to the safety monitoring of level 1, level 2, level 3, and level 4 concrete dams in the classification and design standards of water conservancy and hydropower projects. Level 5 concrete dams can be implemented as a reference. 1.0.3 The safety monitoring scope of concrete dams should include the dam body, dam foundation, dam abutment, bank slope near the dam that has a significant impact on dam safety, and other buildings and equipment that are directly related to dam safety. 1.0.4 Safety monitoring methods should include on-site inspection and instrument monitoring. 1.0.5 Safety monitoring should follow the following principles: 1. The monitoring layout should be based on the scale and level of the project, and combined with the actual project and upstream and downstream impacts; the relevant monitoring items should be coordinated with the layout, highlighting key points, taking into account all aspects, and taking into account numerical calculations and Comparison and verification of model tests. Measuring points in key parts should be set redundantly. 2 Monitoring instruments and equipment should be reliable, durable and practical, with technical performance indicators meeting specifications and engineering requirements, and strive to be advanced and facilitate automated monitoring. 3 Monitoring instruments should be installed according to design requirements. On the premise of reducing the impact on the construction of the main project, the monitoring facilities should be installed, buried and protected in a timely manner; during the construction of the main project, necessary time and space should be provided for the installation, burial and monitoring of instruments and facilities; the initial reading of the monitoring instruments should be done in a timely manner , and fill in the verification form, draw as-built drawings, and file them for future reference. 4 Monitoring should meet the procedures, specifications and design requirements, and relevant monitoring items should be monitored synchronously; when abnormal measurement values are found, retest immediately; the monitoring data should be continuous, true in records, complete in notes, and compiled and analyzed in a timely manner. 5. Monitoring facilities should be inspected, maintained and appraised regularly. Monitoring facilities should be updated and renovated if they do not meet the requirements. Measuring and reading instruments should be checked or calibrated regularly. 6. When an existing dam is undergoing risk removal and reinforcement, reconstruction (expansion), or monitoring facilities are being updated, the original monitoring facilities should be identified. 7 Temporary monitoring facilities can be set up if necessary. Temporary monitoring facilities and permanent monitoring facilities should be

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28 -

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08