SL/T 722-2020 in English
VALIDCode for safe operation of hydraulic steel gates and hoists
- Issued on:2020-04-15
- Implemented on:2020-07-15
- File Format:PDF
- Delivery:Via email within 5 business days
$728.00
| Standard No: | SL/T 722-2020 |
| Document status: | VALID |
| Title in English: | Code for safe operation of hydraulic steel gates and hoists |
| Title in Chinese: | 水工钢闸门和启闭机安全运行规程 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2020-04-15 |
| Implemented on: | 2020-07-15 |
| Superseding: |
SL 240-1999 Classing standard for management of gates、hoists and ship - lifts in water conservancy and hydropower projects
|
| Professional Classification: | SL-Water Resources |
| Related Keywords: | equipment operation specifications hydraulic
safe operation safe operation integrated management system hydraulic steel gates hydraulic system detection digital requirements |
| Related Topics: | safe mode of operation
brake fortune gate start Hoist steel security door Motor Operation Regulations operating procedures plumber Hoist production and execution sl/t247-2020 Gate water seal implementation standards |
Introduction
Background of Standard Revision and Technological Evolution
This standard combines and revises the two old regulations SL722-2015 and SL240-1999, adds new management requirements for mobile gate hoists, and strengthens digital operation and maintenance content. The main technical evolutions include:
| Version comparison dimensions | SL240-1999 | SL722-2015 | SL/T722-2020 |
|---|---|---|---|
| Scope of application | Gate and gate hoist rating | Basic requirements for safe operation | Integrated management system, add mobile gate hoist |
| Technical terms | 12 chapters | 7 chapters + appendix | 8 chapters + enhanced appendix, refinement of hydraulic system detection |
| Digital requirements | Not involved | Basic automation | Newly added network firewall and video surveillance system specifications |
Analysis of core technical requirements
Equipment operation specifications
Hydraulic gate hoist must be checked for oil level in the tank and sealing of the pipeline before operation. The oil temperature during operation must not exceed 65℃; Mobile gate hoist needs to verify the wind resistance of the track clamp, and the track deviation should be ≤3mm/m.
Maintenance system
Typical case: The abnormal noise of the hinge of the radial gate of a reservoir was dealt with. According to the inspection in Article 4.3.2, it was found that the grease had failed. After the pollutant level was tested according to GB/T30507 standard, food-grade grease was replaced. The vibration value dropped from 0.8mm/s to 0.2mm/s.
Key maintenance cycle:
- Daily inspection: once a month, focusing on structural deformation and lubrication status
- Regular inspection: once before/after the flood season each year, including no-load trial run
- Hydraulic oil inspection: measure the contamination degree every 500 operating hours (NAS≤8 level)
Key points for equipment grade assessment
| Rating unit | Class I equipment standard | Key indicators |
|---|---|---|
| Gate water stop device | Water leakage ≤0.1L/(s·m) | Rubber has no cracks, and pressure plate bolts are complete |
| Steel rope of gate hoist | Broken wire number <10% of the total number of wires | Scrap standard specified in GB/T5972 |
| Electrical system | Insulation resistance ≥1MΩ | Grounding resistance <4Ω |
Three types of equipment must be immediately shut down and rectified. Typical problems include: brake shoe wear exceeding 50%, cylinder settlement >200mm, and main rail gnawing depth >1mm.
Emergency management innovation requirements
Newly added Article 6.1.2 specifies that a dual power switching device and a manual emergency release system must be equipped, and the drill frequency requirements are:
- Flood prevention drills: at least one actual drill before the flood season every year
- Ice period drills: complete simulation operations before freezing
- Electrical failure drills: one desktop drill every quarter
Implementation suggestions
1. Establish a digital inspection system, integrating the data of the opening sensor and load cell (accuracy ≥0.5%)
2. Important welds shall be ultrasonically tested every 5 years according to the SL101 standard
3. It is recommended to use an online filtration device to control the cleanliness of the hydraulic system

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SL 275-2001 in English
Field test methods for nuclear density-moisture gauges
2002-01-28 -

SL 19-2001 in English
Compilation rules of final account for completion of water capital construction project
2001-02-08