Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
ecological flow ecological flow computation ecological base flow ecological flow calculation system discharge buildings discharge cdma digital cellular mobile telecommunication network yd/t steam tubes scraper conveyors scopethis standard
SL/T 820-2023 in English

SL/T 820-2023 in English

VALID

Specifications on ecological flow computation and discharge design for water and hydropower projects

  • Issued on:2023-08-07
  • Implemented on:2023-11-07
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $1,300.00
$1,261.00
Standard No: SL/T 820-2023
Document status: VALID
Title in English: Specifications on ecological flow computation and discharge design for water and hydropower projects
Title in Chinese: 水利水电工程生态流量计算与泄放设计规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2023-08-07
Implemented on: 2023-11-07
ICS Classification: 27.140-Hydraulic energy engineering
Chinese Classification: P59-Water power engineering
Professional Classification: SL-Water Resources
Related Keywords: ecological flow
ecological flow computation
ecological base flow
ecological flow calculation system
discharge buildings discharge
Related Topics: water conservancy
hydropower project
Steady State Velocity Calculations
Flow meter production
Calculation flow meter
Process and Quality
Secondary Wiring Design of Water Conservancy and Hydropower Projects
Water Calculation
Quantity calculation
Reclaimed water flow meter
Reclaimed water flow meter
Bioengineering and Equipment
Production of flowmeters around
Hydrological process
Water Resources and Hydropower
Moisture determination calculation
flow calculation
vent
Moisture determination calculation
time ecology
Water Resources and Hydropower Engineering
Water Conservancy and Hydropower Design Estimates
Standard dry flow calculation
Mold waterway flow calculation method
Water conservancy and hydropower engineering automation design
Energy-saving design of water conservancy and hydropower projects
Flowmeter selection specifications
sl/t 595 2023
sl/t 820
sl/t 820-2023
sl 820
Design of pressure steel pipes for water conservancy and hydropower projects
sl/t820-2023


Introduction

Analysis of the core content of the standard

Technical elements Calculation method Applicable scenarios
Ecological base flow Qp method/Tennant method/Frequency curve method Maintaining the basic form and self-purification capacity of rivers and lakes
Flow in sensitive period Ecohydraulics method/Habitat analysis method Special ecological needs such as fish breeding period
Lake water level Morphological analysis method/Water balance method Inland lakes and tailwater lakes

Key technical points

Ecological flow calculation system

The standard establishes a graded and classified calculation framework:

  1. Ecological base flow adopts the driest month flow with a guaranteed rate of 90%-95%
  2. Sensitive period flow needs to be combined with the biological characteristics of indicator species
  3. Rivers with high sediment content need to calculate the sediment transport volume during the flood season separately

Implementation suggestions

Design principles for discharge facilities

  • Give priority to the use of existing discharge buildings
  • Discharge according to the inflow flow at dead water level
  • Set up a remote monitoring system

Technical requirements for monitoring

The monitoring section should be set at: the outlet of the discharge facility, the confluence of the tailwater and the discharge, and the frequency of data collection should not be less than once a day.


Standard evolution analysis

Compared with SL/T 712-2015, this standard adds:

  • Overall calculation method of ecological flow (BBM method)
  • Evaluation system for unique natural landscapes involving water
  • Requirements for coordinated dispatch of cascade power stations

Sample only — not a preview of SL/T 820-2023
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend