Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
digital monitoring requirements systematic requirements technical requirements quarantine facilitiesfor key facility construction available phosphorus content laser therapy equipment hydrogen laser therapy machine vehicle information service systems
SN/T 5476-2022 in English

SN/T 5476-2022 in English

VALID

Requirements for construction of designed quarantine facilitiesfor imported equids

  • Issued on:2022-07-07
  • Implemented on:2023-02-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $210.00
$204.00
Standard No: SN/T 5476-2022
Document status: VALID
Title in English: Requirements for construction of designed quarantine facilitiesfor imported equids
Title in Chinese: 进境马属动物指定隔离检疫场建设规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2022-07-07
Implemented on: 2023-02-01
Professional Classification: SN-Import&Export Inspection
Related Keywords: digital monitoring requirements
systematic requirements
technical requirements
quarantine facilitiesfor
key facility construction
Related Topics: isolation
belongs to
entry
Quarantine entry
specify
sn/t2022
quarantine
quarantine
animal quarantine for the first time
metal release agent
number of animals
Animal quarantine and isolation field construction
Construction of import and export test monkey isolation field
sn/t 5380-2022


Introduction

Standard Background and Significance

With the increasing exchanges of international racehorses and stallions, the SN/T 5476-2022 standard released in 2022 puts forward systematic requirements for the construction of quarantine sites for imported equine animals. This standard replaces the original scattered regulations and integrates the technical parameters of key functional areas such as isolation breeding areas and sick animal quarantine areas for the first time to strengthen the biosafety prevention and control system.


Comparison of core technical requirements

ProjectCompetition/breeding horsesSlaughter horsesDifference explanation
Feeding area≥5㎡/head≥4㎡/headBody size difference requirements
Sports venuesRequiredOptionalUse differences
Anti-media facilitiesMandatory requirementsOptionalDifferent epidemic prevention levels

Key points for key facility construction

1. Partition isolation system

The standard requires the use of three levels of physical isolation: outer wall (≥2m), inner wall (≥1.8m), and functional area partition. Metal mesh fences (mesh size ≤12mm) can be used in mountainous areas, and disinfection channels (size ≥4m×0.3m) can be set up.

2. Biosafety facilities

  • Video surveillance: Covering 15 key points, data retention ≥ 3 months
  • Harmless treatment area: The volume of the burial pit is 0.8m³/head or 1.5m³/head according to the size of the horse
  • Sewage treatment facilities: A seepage-proof collection system must be equipped in accordance with the requirements of NY/T 1168

Implementation recommendations

Site selection optimization plan

It is recommended to give priority to sites with natural barriers (such as mountains and rivers). If there are farms within 10km, a wind direction frequency analysis must be carried out to ensure that the isolation area is located upwind.

Construction timing control

  1. First complete the acceptance of the external isolation facilities
  2. Then build the internal functional zoning
  3. Finally install the monitoring and disinfection system

Technology evolution analysis

Compared with the earlier version, the 2022 standard has the following major upgrades: ① Clarify the standardized configuration of the blood collection channel (separation of the waiting area, blood collection area, and completion area) ② Add digital monitoring requirements ③ Detail the calculation formula for harmless treatment capacity.

Sample only — not a preview of SN/T 5476-2022
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend