SY 4201.4-2016 in English
SUPERSEDEDCode for quality acceptance of oil and gas construction engineering - Equipment installation engineering - Part 4: Boiler device
- Issued on:2016-01-07
- Implemented on:2016-06-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$1,611.00
Scope
This specification is applicable to the acceptance of the construction quality of furnace equipment in equipment installation projects for oil and gas construction projects, including: 1. Overall or skid-mounted installation of oilfield steam injection boilers. 2. The installation of heating furnaces includes the installation of fire-tube heating furnaces (fire-tube direct heating furnaces and fire-tube indirect heating furnaces) and tubular heating furnaces.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY 4201.4-2106 in English
Specifications for Construction Quality Acceptance of Oil and Gas Construction Projects Equipment Installation Project Part 4: Furnaces
2016-01-07 -

SY/T 0048-2016 in English
Petroleum and natural gas engineering general drawing design specifications
2016-12-05