Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
gas construction engineering gas engineering construction installation engineering gas construction engineering-electrical engineering arrester installation engineering other fiber pressure socks gamma teletherapy rooms pned=200/10=20mg/kg long-term assessment
SY 4206-2007 in English

SY 4206-2007 in English

SUPERSEDED

Code for Quality Acceptance of Oil and Gas Construction Engineering-Electrical Engineering

  • Issued on:2007-10-08
  • Implemented on:2008-03-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $740.00
$718.00
Standard No: SY 4206-2007
Document status: SUPERSEDED
Superseded by: SY/T 4206-2019 Code for quality acceptance of oil and gas construction engineering- Electrical engineering
Superseded on: 2020-05-01
Title in English: Code for Quality Acceptance of Oil and Gas Construction Engineering-Electrical Engineering
Title in Chinese: 石油天然气建设工程施工质量验收规范 电气工程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2007-10-08
Implemented on: 2008-03-01
ICS Classification: 75.180-Equipment for petroleum and natural gas industries
Chinese Classification: P91-Electrical construction installation engineering
Professional Classification: SY-Oil & Gas
Related Keywords: gas construction engineering
gas engineering construction
installation engineering
gas construction engineering-electrical engineering
arrester installation engineering
Related Topics: Quality acceptance criteria
Gas tank project construction and acceptance
Quality acceptance
Construction Quality Acceptance of Thermal Insulation Engineering in Petrochemical Industry
Quality acceptance
Acceptance of construction quality of precipitation engineering
Oil and gas construction engineering construction
SY 4206
SY4206
SY4206-2007
Construction Quality Acceptance of Oil and Gas Construction Projects
Regulations for acceptance of construction quality of building curtain wall engineering
Unification of Construction Quality Acceptance of Construction Projects
Construction quality acceptance of building electrical engineering
Construction and acceptance of building electrical engineering
Construction process specification for building electrical engineering DB62T 3030-2018
Electric Power Construction Quality Acceptance and Assessment Procedures
Petroleum Processing Quality
General installation project quality acceptance specifications
Construction quality acceptance of petrochemical furnace construction projects
Municipal electrification project construction and quality acceptance
Communication engineering construction project acceptance
Construction quality acceptance of oil and gas engineering projects
Metallurgical construction engineering construction quality acceptance
Construction and quality acceptance of ancient building construction projects
Ad hoc network project construction quality


1 Scope

This standard specifies quality criteria, content, procedure and project classification principle etc. of electrical engineering inspection lot, subitem project, subsection (sub-subsection) project and unit (subunit) project acceptance of oil and gas construction engineering.
This standard is applicable to the installation of 220kV or below electrical installation and the construction quality acceptance of newly-built, extended and rebuilt overhead power line project in oil and gas engineering construction.

2 Normative References

The following standards contain provisions which, through reference in this text, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding correction to), or revisions of, any of these publications do not apply. However, all parties coming to an agreement according to this standard are encouraged to study whether the latest edition of these documents is applicable. For undated references, the latest edition of the normative document is applicable to this standard.
GBJ 148 "Code for Construction and Acceptance of Power Transformers, Oil Reactor and Mutual Inductor"
GBJ 149 "Erection Works of Electrical Installations Code for Construction and Acceptance of Bus-bar Device"
GB 50150 "Standard for Hand-over Test of Electric Equipment Electric Equipment Installation Engineering"
GB 50168 "Code for Construction and Acceptance of Cable System Electric Equipment Installation Engineering"
GB 50169 "Code for Construction and Acceptance of Grounding Connection Electric Equipment Installation Engineering"
GB 50173 "Code for Construction and Acceptance of 35kV and under Over-head Power Levels Electric Equipment Installation Engineering"
GB 50233 "Code for Construction and Acceptance of 110~500kV Overhead Transmission Line"
GB 50257 "Code for Construction and Acceptance of Electric Device for Explosion Atmospheres and Fire Hazard Electrical Equipment Installation Engineering"
GB 50303 "Code of Acceptance of Construction Quality of Electrical Installation in Building"
SY 4200 "Code for Quality Acceptance of Oil and Gas Construction Engineering-General Rule"

3 Terms and Definitions

For the purposes of this standard, the following terms and definitions apply.
3.1
Wiring system
It refers to the combination of a cable (wire), muliple cables (wires) or bus bars as well as components for fixing them. If required, the wiring system shall also include enclosed cable (wire) or bus bar parts.
3.2
Electrical equipment
It refers to any parts for power generation, power transformation, power transmission, power distribution or power utilization, such as motor, transformer, electric apparatus, measuring instrument, protective device, wiring system equipment and electrical appliances.
3.3
Current-using equipment
It refers to the equipment converting the electric energy to other energy (such as luminous energy, thermal energy, mechanical energy).
3.4
Electrical installation
It refers to the combination of electrical equipment with matched characteristics and for one or several specific purposes.
3.5
Conduit
It refers to a part for protecting round or non-round wiring system of wire or cable in electric installation. The conduit has adequate air tightness to make wires and cables only led into longitudinally instead of transversely.
3.6
Metal conduit
It refers to the conduit made of metal material.
3.7
Insulating conduit
It refers to the conduit made of insulating material, without any conductive part (without internal metal lining or external metal mesh or metal coating.
3.8
Protective conductor (PE)
It refers to a conductor for electrically connecting with the following parts in order to prevent shock hazard occurrence:
——Exposed conductive parts;
——External conductive parts;
——Main earthing terminals;
——Earthing electrode (earthing device);
——Power supply earthing point or artificial neutral contact.
3.9
PEN conductor
It refers to an earthing conductor with both neutral conductor and protective conductor function.

Foreword I
1 Scope
2 Normative References
3 Terms and Definitions
4 General Provisions
5 Basic Requirements
6 Project Classification
7 Cable Line Engineering
8 Pipe Wiring Engineering
9 Trolley Wire Installation Engineering
10 Busbar Installation Engineering
11 Power Transformer Installation Engineering
12 Panel and Cabinet Installation Engineering
13 Circuit Breaker Installation Engineering
14 Disconnecting Switch, Load Switch and High-voltage Fuse Installation Engineering
15 Reactor Installation Engineering
16 Arrester Installation Engineering
17 Capacitor Installation Engineering
18 Transformer Installation Engineering
19 Storage Battery Installation Engineering
20 Lighting Fixtures, Distribution Box and Board Installation Engineering
21 Electrical Inspection and Wiring Engineering for Motor
22 Secondary Circuit Tie Line Engineering
23 Electric Heat Tracing Belt Installation Engineering
24 Earthing Device and Lightning Arrester (Strip and Network) Installation Engineering
25 Pole Tower Foundation Engineering
26 Pole Tower Engineering
27 Stay Wire Installation Engineering
28 Lead Erection Engineering
29 Accessories Installation Engineering
30 On-pole Electrical Equipment and Service Line Installation Engineering
31 Pole tower Earthing Engineering
32 Handover Acceptance Information
Appendix A (Normative) List of Inspection Tools for Electrical Device and Overhead Power Line Installation Engineering
Appendix B (Normative) Quality Control Information Inspection Record of Subsection (Sub-subsection) Project
Appendix C (Normative) Inspection Lot Quality Acceptance Records

Sample only — not a preview of SY 4206-2007
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.