SY/T 5171-2020 in English
VALIDSpecifications of survey for petroleum geophysical prospecting on land
- Issued on:2020-10-23
- Implemented on:2021-02-01
- File Format:PDF
- Delivery:Via email within 5 business days
$476.00
| Standard No: | SY/T 5171-2020 |
| Document status: | VALID |
| Title in English: | Specifications of survey for petroleum geophysical prospecting on land |
| Title in Chinese: | 陆上石油物探测量规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2020-10-23 |
| Implemented on: | 2021-02-01 |
| Superseding: |
SY/T 5171-2011 Specifications of Survey for Petroleum Geophysical Prospecting on Land
|
| Professional Classification: | SY-Oil & Gas |
| Related Topics: | Geophysical prospecting
Petroleum voltage measurement Petroleum offshore oil exploration detecting animals oil detection animal detection Explore Detecting Offshore Oil oil detection Phase detection oil detector detecting animals animal detection offshore oil drilling oil detector geophysical survey Onshore oil production quality sy/t 7494-2020 sy/t 7466-2020 sy/t 7468-2020 |
Introduction
Analysis of the core content of the standard
| Technical elements | Requirements of the 2011 version | Updates to the 2020 version |
|---|---|---|
| Coordinate system | Coexistence of multiple datums | Mandatory use of the CGCS2000 coordinate system |
| Control network level | Unclear classification | Three-level division (relative mean error of the weakest side 1/300,000~1/100,000) |
| GNSS equipment | Only basic parameters are specified | Newly added Beidou Ground-Based Augmentation System Technical Requirements |
Key Technical Indicators
Physical point accuracy requirements: The mean error of the plane position of 3D seismic exploration is ≤1.0m (flat land), and the mean error of elevation is controlled according to the terrain slope grade. It is allowed to be relaxed to ±0.6m in mountainous conditions.
Construction conductor layout: The relative closure error of the full length of the first-level conductor is ≤1/10000, and a total station with an angular measurement accuracy of 3″ is required; the second-level conductor is allowed to use 6″ equipment.
Implementation Suggestions
- Give priority to using the national CORS station to establish a work area control network, and use Qianxun location services in difficult areas
- RTK fixed solutions should be used for physical point measurement, and floating point solutions in jungle areas need to be manually verified for terrain consistency
- Electronic data are stored in the "year-team number" directory, and editing of original data is prohibited

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY/T 5024-1999 in English
Bow-spring casing centralizers
1999-08-09 -

SY/T 6408-2018 in English
Petroleum drilling and production equipment. Operation, inspection, maintenance, and repair of drilling and well servicing structures
2018-10-29 -

SY/T 5951-1994 in English
Technical conditions for epoxy phenolic anti-corrosion oil pipe
1994-12-01 -

SY/T 5599-2012 in English
Compiling specification for the mud logging summary report of exploration wells
2012-08-23 -

SY/T 4054-2003 in English
Radiation crosslinked polyethylene heat shrinkable tape (sleeve
2003-03-18 -

SY/T 5890-1993 in English
Method for evaluating the performance of fungicides
1994-01-06 -

SY/T 6185-1996 in English
Database table structure of oil field development
1996-11-15 -

SY 5138-1992 in English
Three-cylinder single-acting drilling pump
1992-09-17 -

SY/T 5570-1993 in English
YKZ480 telemetry CNC seismograph
1993-03-27