SY/T 5874-2012 in English
SUPERSEDEDEvaluation Method on Oil Well Water Plugging
- Issued on:2012-08-23
- Implemented on:2012-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$146.00
Scope
This standard specifies the evaluation method of oil well water plugging effect, process success and economic benefits. This standard is applicable to the evaluation of the water plugging effect of oil wells in oil fields.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 5870-1993 in English
Bellows for casing subsidy
1994-01-06 -

SY 5210-1991 in English
Well repair faucet
1991-11-20 -

SY/T 5439-2003 in English
Pneumatic cement-discharging tanker
2003-03-18 -

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY/T 5586-1993 in English
Contract specifications for the introduction of complete sets of equipment for the petroleum industry
1993-03-27 -

SY/T 5587.5-1993 in English
Oil and water well conventional workover operation oil and water well sand detection surface, sand washing operation rules
1993-09-09 -

SY/T 6008-1994 in English
General Rules for Material Procurement
1995-01-18 -

SY/T 6900-2020 in English
Checking items and technical specifications for Sercel 400 series seismic data acquisition system
2020-10-23 -

SY/T 0453-1998 in English
Standard for quality inspection and evaluation of petroleum construction engineering collection and transportation pipeline engineering in oil field
1999-03-03 -

SY/T 5225-1994 in English
Oil and gas drilling, development, production and storage of fire and explosion safety regulations
1995-01-18