SY/T 6180-2009 in English
VALIDCode for operation of C/O spectrum logging
- Issued on:2009-12-31
- Implemented on:2010-05-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$117.00
| Standard No: | SY/T 6180-2009 |
| Document status: | VALID |
| Title in English: | Code for operation of C/O spectrum logging |
| Title in Chinese: | 碳氧比能普测井作业规程 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2009-12-31 |
| Implemented on: | 2010-05-01 |
| Superseding: |
SY/T 6180-1996 C/O Ratio Energy Spectrum Logging Operation Regulations
|
| Professional Classification: | SY-Oil & Gas |
| Related Keywords: | operation instrument operation specifications key control
neutron generator operation specifications operation specification c/o spectrum energy spectrum |
| Related Topics: | carbon oxygen
Logging sy/t 6238.1 energy spectrum carbon carbon oxygen Oxycarbon Oxygen operation general survey Curve ratio Oxycarbon How to measure carbon monoxide downhole γ spectrum logging Comparison sy/t6726-2009 |
本标准规定了碳氧比能谱测井作业安全、防护、现场施工程序及测井资料录取要求。本标准适用于碳氧比能谱测井作业。
Introduction
Background of Standard Revision and Technological Evolution
This standard replaces the 1996 version of the regulations, mainly reflecting three major technical upgrades: strengthening of radioactive protection standards, refining of neutron generator operation specifications, and expansion of environmental safety requirements. Five new referenced standards, including SY/T 6610, reflect the industry's emphasis on hydrogen sulfide protection.
Core safety control requirements
| Control dimensions | Requirements of the 1996 version | Upgrade points of the 2009 version |
|---|---|---|
| Radioactive protection | Basic dose limit | Increase the wearing of dose meter cards (Article 3.11) |
| Neutron generator | Simple start-stop requirements | Clearly define 50m start-up depth + 30min cooling period (Articles 3.1-3.2) |
| Emergency management | Not clarified | Newly added SY/T 6610 Sulfur well operation specification (Article 3.5) |
Key technical points of logging operation
Instrument operation specifications
Key control of neutron generator operating parameters: yield stability ±10% (8.3), single/dual source distance measurement speed ≤90m/h/60m/h respectively (6.3.1/6.5.2). Spectral line adjustment needs to ensure accurate positioning of oxygen peak and iron peak (6.2.11).
Data quality control
- Required curves: 4 main curves such as carbon-oxygen ratio curve and inelastic calcium-silicon ratio curve (7.1)
- Disk record: The original data of energy spectrum and time spectrum must be completely saved (7.2)
- Repeat measurement: Abnormal well sections must be remeasured and recorded (6.2.18)
Implementation suggestions for comparison between the new and old standards
Typical change case: New requirements for blowout preventers in through-tubing logging (6.5.1), and it is recommended to equip a special wellhead adapter for through-tubing carbon-oxygen ratio instrument. The spectrum scale check (6.3.11 of the 1996 version) deleted in the original standard has been integrated into the SY/T 5693 specification.
Transitional implementation: Instruments that have completed calibration before May 1, 2010 can continue to use the original method, but they need to complete the new version of the safety assessment.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY/T 5495-1992 in English
Long-distance pipeline laying work quota
1992-09-17 -

SY 5261-1991 in English
Calculation method for strength of pressure components of fire barrel heating furnace
1991-07-19 -

SY/T 5899-1993 in English
Technical conditions of hydraulic power instrument
1994-01-06 -

SY/T 0453-1998 in English
Standard for quality inspection and evaluation of petroleum construction engineering collection and transportation pipeline engineering in oil field
1999-03-03 -

SY/T 011-1996 in English
Design specifications for natural gas purification plants in gas fields
1996-12-03 -

SY/T 5962-1994 in English
Well washing machine
1994-12-01 -

SY/T 5885-1993 in English
High concentration hydrochloric acid corrosion inhibitor CT1-3 for acidification
1994-01-06 -

SY 5482-1992 in English
Seismic Exploration Data Processing Quality Inspection Rules
1992-09-17 -

SY 0322-2000 in English
Standard for quality inspection and evaluation of petroleum construction engineering in natural gas purifying plant
2000-03-31