SY/T 6396-2014 in English
VALIDSlot layout and anti-collision technical requirements of platform cluster well drilling
- Issued on:2014-10-15
- Implemented on:2015-03-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$243.00
Slot layout and anti-collision technical requirements of platform cluster well drilling
1 Scope
This standard specifies the slot layout and anti-collision design and construction technical requirements of platform cluster well drilling.
This standard is applicable to slot layout and anti-collision design and construction of platform cluster well drilling.
Other wells with the risk of well bore collision can refer to the relevant contents of this standard.
2 Normative references
The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition (including any amendments) applies.
GB/T 28911 Vocabulary of drilling engineering for the petroleum and natural gas
SY/T 5431 The design method of casing program
3 Terms and definitions
For the purposes of this document, the terms and definitions given in GB/T 28911 and the following apply.
3.1
separation factor
ratio of the center to center between the two shafts to the sum of the major axis radii (R1 and R2) of the error ellipse of the two shafts (see Annex A)
3.2
anti-collision section
section having separation factor less than 2 from adjacent wells or the nearest distance from adjacent wells less than 20m
4 Principle for platform arrangement for the cluster well
4.1 Principles for determining platform position
It shall meet the requirements of geological design, drilling and oil production technology as well as safety and environmental protection.
4.2 Principle for platform arrangement for the cluster well
4.2.1 The location of cluster well platform shall be selected according to the coordinates and maximum displacement of the target point to be drilled and the geographical conditions. The platform shall be located on the centroid of the plane particle system composed of unit particles at each well target. When the centroid is not on the target coordinate, the platform position shall be moved to the target coordinate nearest to the centroid, as shown in Annex B.
4.2.2 The corresponding distribution relationship between wellhead and target point of the platform shall be such to minimize sum of horizontal displacements of wells in the platform, and avoid intersection of azimuth lines.
Foreword i
1 Scope
2 Normative references
3 Terms and definitions
4 Principle for platform arrangement for the cluster well
5 Anti-collision design of well bore
6 Technical requirements for construction of anti-collision section
Annex A (Normative) Separation factor
Annex B (Normative) Platform position determination
Annex C (Normative) Nearest distance scanning method
Annex D (Informative) Anti-collision scanning

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

SY 5270-1991 in English
Technical regulations for the design of high-pressure water injection pipeline accessories
1991-07-19 -

SY/T 5429-1991 in English
Small diameter flow moisture tester
1992-01-15 -

SY 5500-1992 in English
Labor quota for seismic exploration in desert areas
1992-09-17 -

SY 5287-1991 in English
Sand mixer technical conditions
1991-07-19 -

SY/T 6140-1995 in English
Purchasing regulations for scale inhibitors used in the essential treatment of oilfield water injection
1995-12-25 -

SY/T 5870-1993 in English
Bellows for casing subsidy
1994-01-06 -

SY/T 5358-2010 in English
Formation damage evaluation by flow test
2010-08-27 -

SY/T 5987-1994 in English
Technical conditions for ordering drill pipe abroad
1995-01-18 -

SY/T 6182-1996 in English
Production Profile Logging Tool Calibration Procedure Fluid Density Logging Tool
1996-04-21 -

SY/T 6268-1996 in English
Recommended Practices for Selection of Tubing and Casing
1996-12-31