Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
rotary wall coring instrument introduction analysis rotary wellbore pressure group group a environmental adaptability classification temperature group group a temperature group information technology security techniques non-repudiation part update results green practices
SY/T 7798-2024 in English

SY/T 7798-2024 in English

VALID

Drilling Rotary Wall Coring Instrument

  • Issued on:2024-09-24
  • Implemented on:2025-03-24
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $299.00
$291.00
Standard No: SY/T 7798-2024
Document status: VALID
Title in English: Drilling Rotary Wall Coring Instrument
Title in Chinese: 钻进式旋转井壁取心仪
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2024-09-24
Implemented on: 2025-03-24
ICS Classification: 75.180.10-Exploratory and extraction equipment
Chinese Classification: E91-Petroleum exploration logging equipment and instrument
Professional Classification: SY-Oil & Gas
Related Keywords: rotary wall coring instrument introduction analysis
rotary wellbore
pressure group group a
environmental adaptability classification temperature group group a
temperature group


Introduction

Analysis of the core content of the standard

This technical standard aims at the full life cycle management requirements of the drilling rotary wellbore coring instrument, forming a complete specification system from design and manufacturing to transportation and storage. The instrument is divided into two categories according to the inner diameter of the coring drill bit: Type I (24-26mm) and Type II (36-40mm), which correspond to different operating scenario requirements.


Comparison of key technical indicators

Performance parameters Type I requirements Type II requirements
Time for single core ≤3 minutes ≤5 minutes
Minimum output torque (N·m) 3 4
Power requirement (W) 250 350

Environmental adaptability classification

Temperature group

  • Group A: 155℃
  • Group D: 235℃ (highest level)

Pressure group

  • Group A: 100MPa
  • Group D: 170MPa

Key test methods

High temperature and high pressure composite test

Functional verification must be carried out under constant temperature and pressure conditions for 1 hour. The test parameters must meet the requirements of both 5.2.1 Temperature group and 5.2.2 Pressure group.

MTBF calculation method

The mean time between failures is calculated using the formula: $$\mathbf{MTBF}{=}\frac{1}{N}\sum_{j=1}^{N}t_{i}$$, requiring the test sample size to be ≥3 units, and the total test time to cover the 200 hours baseline.


Implementation recommendations

Maintenance cycle

During storage, a power-on inspection is required every 6 months, and the ambient humidity should be controlled at ≤90%.

Key points of quality control

  1. Factory inspection must include 11 mandatory inspection items such as coring performance and pushing force
  2. Type inspection sampling is based on 1-3% of the production batch
  3. Focus on the 10% length error threshold of the core detection module

Sample only — not a preview of SY/T 7798-2024
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend