TB/T 2286.2-2008 in English
SUPERSEDEDPrestressed concrete pole for overhead contact system of electrified railway Part 2: Circular pole
- Issued on:2008-01-25
- Implemented on:2008-01-25
- File Format:PDF
- Delivery:Via email within 1~3 business days
$204.00
Scope
This part specifies the product classification, technical requirements, test methods, inspection rules, signs and factory certificates, storage and transportation of electrified railway catenary ring prestressed concrete pillars. This section applies to electrified railway catenary ring-shaped prestressed concrete pillars (hereinafter referred to as pillars). Similar catenary pillars used in urban rail transit can be implemented with reference to this section.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

TB/T 3590-2023 in English
Technical requirements for the safety detection and monitoring system of electrified railway power supply
2023-12-20 -

TB/T 2075.23-2024 in English
Electrified Railway Overhead Contact System Components - Part 23: Tunnel Anchor Compensation Device
2024-11-22 -

TB/T 3252-2022 in English
Electrified railway rigid suspension contact network busbars and components
2022-01-19 -

TB/T 2920-2023 in English
Electrified railway contact network hard crossing
2023-02-27 -

TB/T 2007-2015 in English
Guide to the selection of insulators for overhead contact system of electrified railways
2015-04-24