T/QX 002-2020 in English
VALIDCost composition of industrial cleaning project
- Issued on:2020-05-28
- Implemented on:2020-07-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$214.00
本文件给出了工业清洗工程项目费用的构成总则及计算方法。
本文件适用于化学清洗、高压水射流清洗、物理(储罐)清洗工程项目费用的预算编制与商务报价。
Scope
This document gives the general principles and calculation methods for the cost of industrial cleaning projects. The cost of industrial cleaning projects is composed of direct costs + indirect costs + profits + taxes. Direct costs include direct engineering costs and measure costs. Direct engineering costs refer to the various costs incurred to complete the project entity during the cleaning construction process, including labor costs, material costs, and machinery costs. Measure fees refer to the non-engineering entity project costs in terms of technology, life, environmental protection and other aspects that occur in the preparation and construction process of the project to complete the construction of the project. Measure fees include general measure fees and other measure fees. Indirect costs include corporate management fees and regulatory fees. Enterprise management fees refer to the expenses required by construction enterprises to organize construction and operation and management. Fees refer to the fees that must be paid according to the regulations of the government and relevant departments. The profit is the balance after the construction company completes the cleaning project, subtracting the estimated costs from the estimated revenue. Taxes are various taxes that should be included in the cost of cleaning projects according to national and local tax laws.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

T/QX 005-2021 in English
Operational norms for mechanical cleaning of oil tanks for gas filling station
2021-05-11