TSG D3001-2009 in English
SUPERSEDEDPressure Pipe Installation Licensing Regulation
- Issued on:2009-05-08
- Implemented on:2009-05-08
- File Format:PDF
- Delivery:Via email within 1~3 business days
$194.00
Article 1. In order to regulate pressure piping installation permission operation, this Regulation is formulated by referring to " Regulations on Safety Supervision over Special Equipment" (hereinafter referred to as "regulation") and "Decision of the State Council on Establishing Administrative Licenses for Administrative Examination and Approval Items Really Necessary to be Retained " (Decree of the State Council of the People’s Republic of China No. 548) .
Article 2. All organizations engaged in pressure piping installation within the territory of PRC (hereinafter referred to as “installation organization") shall comply with this regulation in terms of installation permission installation.
Article 3. As for pressure piping installation permission, admission shall be confirmed according to pressure piping category and its level. Pressure piping category and its levels are GA type, GB type, GC type, GD type; see annex A accessory for specific division.
Article 4. The General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China (hereinafter referred to as “AQSIQ”) will be in charge of pressure piping installation permission.
AQSIQ will be in charge of pressure piping installation permission acceptance, examination, approval, issue of certificate of GA type [long distance transmission (oil gas) pipeline belt plug, management working site corrosion prevention task (grade A)], GC1 and GD1 level. Provincial quality technical supervision department will be in charge of pressure piping installation permission acceptance, examination, approval, certificate of other levels within the administrative scope.
“special equipment installation reconstruction maintenance license" (pressure piping installation) is valid for 4 years.
Article 5. AQSIQ will promulgate name list of pressure piping installation permission judgment evaluation institution (hereinafter referred to as “judgment evaluation institution")
Foreword
Chapter 1 General provisions
Chapter 2 Fundamental conditions and requirements for installation permission
Chapter 3 Installation permission procedures
Chapter 4 Supervision and management
Chapter 5 Supplementary articles
Annex A Pressure piping installation permission category and its levels
Annex B Pressure piping installation permission resource requirements

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

TSG G7002-2011 in English
Boiler Periodical Inspection Regulation (Draft for Comments)
- -

TSG Q7016-2016/XG1-2020 in English
Lifting Appliances Installation||Modernization & General Overhaul Supervision Inspection Regulation,includes Amendment 1
2020-05-15 -

TSG Z8002-2022/XG1-2023 in English
Examination Rules for Special Equipment Inspectors, includes Amendment 1
2023-11-09 -

TSG T7001-2009/XG3-2019 in English
Regulation for lift supervisory inspection and periodical inspection-Traction and positive drive lift, includes Amendment 3
2019-10-31 -

TSG D7002-2023 in English
Pressure Piping Components Type Test Regulation
2023-07-07 -

TSG S7001-2004 in English
Regulation for installation supervision inspection and periodicity inspection of passenger surface lifts
2004-06-23 -

TSG Z0003-2005 in English
Examination requirements for survey and assessment personnel of special equipment licensing
2005-09-16 -

TSG 21-2016/XG1-2020 in English
Supervision Regulation on Safety Technology for Stationary Pressure Vessel,includes Amendment 1
2021-01-04 -

TSG 07-2019/XG1-2021 in English
Regulation for Production and Filling Licensing of Special Equipment ,includes Amendment 1
2021-12-08 -

TSG ZF003-2011/XG1-2017 in English
Safety Technical Supervision Regulations for Bursting Disc Devices
2017-01-16