Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
public library introduction standard framework library professional work county library branch library system main library needs requlations automotive applications hydraulic method introductionthis standard
WH/T 87.3-2019 in English

WH/T 87.3-2019 in English

VALID

Public library professional work specifications- Part 3:County public library

  • Issued on:2019-09-04
  • Implemented on:2019-09-04
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $970.00
$941.00
Standard No: WH/T 87.3-2019
Document status: VALID
Title in English: Public library professional work specifications- Part 3:County public library
Title in Chinese: 公共图书馆业务规范 第3部分:县级公共图书馆
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2019-09-04
Implemented on: 2019-09-04
Professional Classification: WH-Culture
Related Keywords: public library introduction standard framework
library professional work
county library
branch library system
main library needs
Related Topics: library
Book
online electronic library
colocalization map
Figure colocalization
online library
National Library Book Processing


Introduction

Standard framework and core content

Business moduleCore requirementsKey indicators
Document acquisitionEstablish collection development policy and unify procurement processDocument acceptance ≤5 working days, transfer ≤7 working days
Document organizationCataloging in accordance with national standards such as GB/T 3792Shelving accuracy ≥90%
Reader serviceEstablish a mechanism for borrowing and returning books between the main and branch librariesProvide closed-shelf documents ≤30 minutes

Detailed explanation of key business specifications

Document digitization management

The standard requires that document digitization should comply with the GB/T 31219 series standards, metadata recording should consider retrieval efficiency, and regular inspection of storage media quality. Typical case: A county library increased reader visits by 120% by establishing a digital local chronicles library.

Construction of the main and branch library system

The main library needs to coordinate the formulation of regional service specifications to achieve five unifications: resource procurement, cataloging, distribution, service policies, and service standards. Implementation suggestions: Establish a quarterly joint meeting system and configure a unified logistics system.


Technical specifications and innovation requirements

Informatization construction standards

  • Network security: comply with the GB/T 22239 graded protection requirements
  • Data backup: implement a dual backup strategy in different locations and on different machines
  • System response: core business system fault recovery ≤ 2 hours

Services for special groups

An independent Braille reading room must be set up (the configuration of equipment such as the Braille display shall refer to GB/T 36719), and children's reading activities shall be carried out ≥ 4 times a year.


Implementation suggestions and evaluation mechanism

Working stagesImplementation pointsSupporting tools
System constructionRevise the collection development policy every 3 yearsAppendix A indicator system
Staff trainingAnnual off-the-job training per capita ≥15 daysWH/T71 reference consultation standard
Performance evaluationThird-party evaluation ratio ≥30%Business archive management system

Sample only — not a preview of WH/T 87.3-2019
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend