WH/T 87.3-2019 in English
VALIDPublic library professional work specifications- Part 3:County public library
- Issued on:2019-09-04
- Implemented on:2019-09-04
- File Format:PDF
- Delivery:Via email within 5 business days
$941.00
| Standard No: | WH/T 87.3-2019 |
| Document status: | VALID |
| Title in English: | Public library professional work specifications- Part 3:County public library |
| Title in Chinese: | 公共图书馆业务规范 第3部分:县级公共图书馆 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 5 business days |
| Issued on: | 2019-09-04 |
| Implemented on: | 2019-09-04 |
| Professional Classification: | WH-Culture |
| Related Keywords: | public library introduction standard framework
library professional work county library branch library system main library needs |
| Related Topics: | library
Book online electronic library colocalization map Figure colocalization online library National Library Book Processing |
Introduction
Standard framework and core content
| Business module | Core requirements | Key indicators |
|---|---|---|
| Document acquisition | Establish collection development policy and unify procurement process | Document acceptance ≤5 working days, transfer ≤7 working days |
| Document organization | Cataloging in accordance with national standards such as GB/T 3792 | Shelving accuracy ≥90% |
| Reader service | Establish a mechanism for borrowing and returning books between the main and branch libraries | Provide closed-shelf documents ≤30 minutes |
Detailed explanation of key business specifications
Document digitization management
The standard requires that document digitization should comply with the GB/T 31219 series standards, metadata recording should consider retrieval efficiency, and regular inspection of storage media quality. Typical case: A county library increased reader visits by 120% by establishing a digital local chronicles library.
Construction of the main and branch library system
The main library needs to coordinate the formulation of regional service specifications to achieve five unifications: resource procurement, cataloging, distribution, service policies, and service standards. Implementation suggestions: Establish a quarterly joint meeting system and configure a unified logistics system.
Technical specifications and innovation requirements
Informatization construction standards
- Network security: comply with the GB/T 22239 graded protection requirements
- Data backup: implement a dual backup strategy in different locations and on different machines
- System response: core business system fault recovery ≤ 2 hours
Services for special groups
An independent Braille reading room must be set up (the configuration of equipment such as the Braille display shall refer to GB/T 36719), and children's reading activities shall be carried out ≥ 4 times a year.
Implementation suggestions and evaluation mechanism
| Working stages | Implementation points | Supporting tools |
|---|---|---|
| System construction | Revise the collection development policy every 3 years | Appendix A indicator system |
| Staff training | Annual off-the-job training per capita ≥15 days | WH/T71 reference consultation standard |
| Performance evaluation | Third-party evaluation ratio ≥30% | Business archive management system |

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

WH/T 19-2003 in English
Graphical symbol codes and drawings regulations for sound reinforcement system
2003-07-23 -

WH/T 14-2001 in English
The Standard for the Restoration and Quality Control of Ancient Books
2001-03-26 -

WH/T 18-2003 in English
Acoustic performance indicators of sound reinforcement system in theatrical performance venues
2003-07-23 -

WH/T 102-1996 in English
Stage electric single point crane
1996-12-06