Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
series connection charge introductionthe document delay time time interval tandem charge warhead systems version tooth profile coverage three types uniform thread spiral flute taps round cutter holder
WJ 2689-2008 in English

WJ 2689-2008 in English

VALID

Measurement of delay time for fuze of warhead of series connection charge

  • Issued on:-
  • Implemented on:-
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $130.00
$127.00


Introduction

The document outlines a specific method for testing the time interval of fuses in tandem charge warhead systems. It provides detailed procedures and conditions for conducting tests to ensure the reliability and performance of the fuses under various scenarios. The content includes definitions, test equipment requirements, test procedures, data recording methods, and criteria for evaluating test results. This standard is applicable to the development, production, and quality control processes of relevant military products. It aims to establish a unified technical basis for testing and evaluating the time interval characteristics of fuses used in tandem charge warhead systems. The document also specifies the format and content of test reports to ensure consistency and comparability of test data across different testing environments and organizations.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of WJ 2689-2008
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend