Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)

Ground immersion process hole construction

Ground immersion process hole construction, Total:25 items.

The international standard classification for "Ground immersion process hole construction" includes: .

The Chinese standard classification for "Ground immersion process hole construction" includes: .


Professional Standard - Nuclear Industry

  • EJ/T 20039-2014 Technological requirements of well drilling and completion on in-situ leaching of uranium
  • EJ/T 20002-2011 Specifications for design of uranium mining process by in-situ blasting and leaching

Beijing Provincial Standard of the People's Republic of China

  • DB11/T 1832.1-2021 Construction technology specification for construction engineering part 1: foundation engineering
  • DB11/T 1832.7-2022 Construction technology specification for building engineering Part 7: Building ground engineering
  • DB11/T 1143-2014 Construction technology specification for garden paving sub-item

Professional Standard - Electricity

  • DL/T 2309-2021 Construction technology guide for sustained release ion grounding device in power engineering
  • DL/T 5733-2016 Construction Technology Guide for the Grounding Module of Overhead Transmission Line
  • DL/T 5291-2013 Crimping Technology Guide for Conductor and Ground Wire of 1000kV Power Transmission and Transformation Project

Professional Standard-Ships

SCC

  • BS 8000-3:1989 Workmanship on building sites-Code of practice for masonry
  • BS 8000-10:1989 Workmanship on building sites-Code of practice for plastering and rendering
  • BS 8000-11.1:1989 Workmanship on building sites. Code of practice for wall and floor tiling-Ceramic tiles, terrazzo tiles and mosaics

National Fire Protection Association (NFPA)

CN-QIYE

  • Q/GDW 193-2008 Guidelines for Construction Technology of 1000kV Power Transformer and Oil-immersed Reactor
  • Q/GDW 191-2008 Guidelines for Construction Technology of Grounding Device in 1000kV Substation

GOST

  • GOST R 59932-2021 Uranium production enterprises by leaching downhole and heap leaching. Technological process design norms

German Institute for Standardization

  • DIN V 1264:2003 Steps for underground man entry chambers - Application in construction works for wastewater disposal

British Standards Institution (BSI)

  • BS 8000-14:1989(1998) Workmanship on building sites — Part 14 : Code of practice for below ground drainage CAWS R12
  • 19/30376291 DC BS 8000-3. Workmanship on construction sites. Part 3. Code of practice for masonry

SAE - SAE International

Society of Automotive Engineers (SAE)