Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
buried glass fiber water supply general water supply plastic sand-filled pipe pipe plastic mortar pipeline transformer cooling control library carts automotive wheels scopethis standard
CECS 190-2005 in English

CECS 190-2005 in English

VALID

Specification for structural design of buried glass fiber reinforced plastic mortar pipeline of water supply and sewerage engineering

  • Issued on:2005-10-25
  • Implemented on:2006-03-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $400.00
$388.00


Scope

This procedure is applicable to the design of buried glass fiber reinforced plastic sand-filled pipe pipe structures using artificial earth arc foundations in general water supply and drainage projects for urban public facilities and industrial enterprises, where the temperature of the transmission medium is lower than 40°C. This regulation is not applicable to the structural design of water supply and drainage engineering pipelines in industrial enterprises that have special requirements. The design of buried glass fiber reinforced plastic pipe structures in water supply and drainage projects can be implemented with reference to this procedure.

Sample only — not a preview of CECS 190-2005
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • CECS 383-2015 in English

    CECS 383-2015 in English

    Technical specification for push-fit self-lock connection

    2015-03-23
  • CECS 59-1994 in English

    CECS 59-1994 in English

    Technical specification for vibration isolation of water pump

    1994-08-16
  • CECS 214-2006 in English

    CECS 214-2006 in English

    Design Specification for Self-sustaining Longitudinally over-crossing Structure of Steel Pipe of Water Supply

    2006-12-22
  • CECS 416-2015 in English

    CECS 416-2015 in English

    Technical specification for detention tank controlling urban stormwater pollution

    2015-09-29
  • CECS 132-2002 in English

    CECS 132-2002 in English

    Technicla specification for application of multi-function control valve for pumping systems of water and wastewater engineering

    2002-05-14
  • CECS 216-2006 in English

    CECS 216-2006 in English

    Technical specification for structure of circular prestressed concrete water tanks of water supply and sewerage engineering

    2006-12-26