Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
air conditioning drainage pipeline projects composite steel pipeline engineering scopethis procedure applies pipeline projects stainless steel building water supply aircraft turbine open gear oils stainless stee plate
CECS 205-2015 in English

CECS 205-2015 in English

VALID

Technical specification for stainless steel lined or claded composite steel pipeline engineering

  • Issued on:2015-10-20
  • Implemented on:2016-02-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $1,320.00
$1,281.00
Standard No: CECS 205-2015
Document status: VALID
Title in English: Technical specification for stainless steel lined or claded composite steel pipeline engineering
Title in Chinese: 内衬(覆)不锈钢复合钢管管道工程技术规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2015-10-20
Implemented on: 2016-02-01
Superseding: CECS 205-2006 Technical specification for stainless steel lined composite steel pipeline engineering of water supply
Chinese Classification: P42-Building water supply and draining engineering
Professional Classification: CECS-Engineering Construction Standard
Related Keywords: air conditioning drainage pipeline projects
composite steel pipeline engineering scopethis procedure applies
pipeline projects
stainless steel
building water supply
Related Topics: Stainless steel pipe acceptance
steel pipe
gcms lined pipe
Pipe Momentum Engineering
Acceptance specifications for lined pipes
Steel structure and pipeline coating engineering technology
Clad steel technology
sl 205-2015


Scope

This procedure applies to the design, construction and acceptance of newly built, renovated and expanded building water supply and drainage, industrial water supply and drainage, municipal water supply and drainage, fire water supply and drainage and air conditioning drainage pipeline projects. Pipeline projects for transporting fluids such as gas, air, oil and steam may also adopt this procedure as needed, and shall also comply with relevant standards in this field.

Sample only — not a preview of CECS 205-2015
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • CECS 363-2014 in English

    CECS 363-2014 in English

    Technical specification for WAB building same-floor maintenance drainage system

    2014-02-18
  • CECS 404-2015 in English

    CECS 404-2015 in English

    Technical specification for polypropylene sound insulating pipeline of building drainage system

    2015-07-01
  • CECS 137-2015 in English

    CECS 137-2015 in English

    Specification for structural design of reinforced concrete sinking well of water supply and sewerage engineering

    2015-04-16
  • CECS 135-2002 in English

    CECS 135-2002 in English

    Technical specification for extra-thin-wall stainless steel and plastic composite pipeline engineering of building water supply

    2002-08-20