Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
field verification field work electric field regional geoelectric field observation network comparative observation timeliness guarantee measures field work wear-resistant requirements paraben preservatives atomized nickel powder
DB/T 94-2024 in English

DB/T 94-2024 in English

VALID

Report writing specifieations for the field verification of observed seismieanomaly-Geoelectricity

  • Issued on:2024-03-01
  • Implemented on:2024-09-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00

本文件规定了地震地电观测异常现场核实报告的基本要求、资料收集与分析的主要内容以及编排格式。
本文件适用于地震地电观测异常现场核实报告的编写。


Introduction

Standard Framework and Technological Evolution

Version Core Changes Technological Breakthroughs
DB/T 70-2018 Establishing the Standard for Underground Fluid Observation for the First Time Introducing Multi-parameter Joint Analysis
DB/T 94-2024 Refining the Abnormal Handling Process of Geoelectric Observation Adding Quantitative Analysis of Electric Field Perturbation

Key Terms Analysis

Earth resistivity influence coefficient: a weight parameter that characterizes the relationship between the true resistivity change of the medium and the observed value, and the calculation formula is k=Δρobservation/Δρtrue value. Case: k=0.78 was measured in the data calibration of Tianshui Station in Gansu in 2019.
Electrode distribution area: a circular monitoring area with the midpoint of the electrode distance as the center and the radius calculated according to earth resistivity(3L/5), electric field disturbance(3L/5), and earth electric field(2L/3).

Four-step process for abnormality verification

  1. System detection: including 12 indicators such as electrode grounding resistance (required ≤50Ω), line insulation (≥10MΩ)
  2. Environmental investigation: identify interference sources such as high-voltage lines and pumping wells within a radius of 3L
  3. Data analysis: use convolution filtering to eliminate precipitation interference, and use numerical simulation to calculate the impact of leakage
  4. Anomaly determination: classified by confidence level (A/B/C) and prediction period (background/medium-term/short-term/imminent earthquake)

Implementation suggestions

Typical problem handling solutions

  • Synchronicity anomaly: it is recommended to establish a regional geoelectric field observation network for cross-validation
  • Frozen soil interference: Use electrode heating device to maintain constant temperature observation in winter
  • Data in doubt: Start the backup measuring electrode for 72 hours of comparative observation

Timeliness guarantee measures

Field work must be started within 72 hours after the abnormality is discovered, and the report should be completed and filed within 5 working days after the completion of the field work.

Sample only — not a preview of DB/T 94-2024
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend