Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
power plants scopethis standard thermal power units chemistry systems power chemical system water summer toboggan small hollow block pumped-storage power station projects
DL/T 1076-2007 in English

DL/T 1076-2007 in English

SUPERSEDED

Guideline for the commissioning of chemistry systems in power plants

  • Issued on:2007-12-03
  • Implemented on:2008-06-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $390.00
$379.00

本标准规定了火电机组化学系统调试的工作内容,对机组调试阶段的化学监督提出了要求。
本标准适用于单机容量为125MW及以上的新建或扩建火电机组,其他类型的机组可参照执行。


Scope

This standard stipulates the work content of the chemical system debugging of thermal power units and puts forward requirements for chemical supervision during the debugging stage of the unit. This standard applies to newly built or expanded thermal power units with a single unit capacity of 125MW and above. Other types of units can be implemented as a reference.

Sample only — not a preview of DL/T 1076-2007
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 706-2017 in English

    DL/T 706-2017 in English

    Determination method of spontaneous ignition point of anti-fuel oil for power plant

    2017-08-02
  • DL/T 555-2004 in English

    DL/T 555-2004 in English

    Guide for withstand voltage and insulated test of gas-insulated metal-enclosure switchgear on site

    2004-03-09
  • DL/T 2761-2024 in English

    DL/T 2761-2024 in English

    Guidelines for explosion-proof inspection of heating surfaces of boilers in thermal power plants

    2024-05-24
  • DL/T 1331-2024 in English

    DL/T 1331-2024 in English

    Guidelines for testing AC power transformation equipment without removing high voltage leads

    2024-12-25