DL/T 1879-2018 in English
VALIDAcceptance specifications for smart substation monitoring and control system
- Issued on:2018-12-25
- Implemented on:2019-05-01
- File Format:PDF
- Delivery:Via email within 5 business days
Price(USD):
$360.00
$350.00
$350.00
Introduction
This document specifies the requirements and methods for the acceptance of intelligent substation monitoring systems. It covers aspects such as system functions, performance indicators, testing procedures, and quality control measures. The content provides guidance on the verification of key parameters, the evaluation of system reliability, and the documentation needed for successful project completion. It also includes detailed descriptions of the acceptance criteria for various components of the monitoring system, ensuring consistency and compliance with established technical standards. The document is intended to support the implementation of reliable and efficient monitoring systems within the specified application areas.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of DL/T 1879-2018

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26