Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
smart substation monitoring monitoring system control system introductionthis document acceptance specifications efficient monitoring systems color tubes type ltb201013 eddy current inspection equipment
DL/T 1879-2018 in English

DL/T 1879-2018 in English

VALID

Acceptance specifications for smart substation monitoring and control system

  • Issued on:2018-12-25
  • Implemented on:2019-05-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $360.00
$350.00


Introduction

This document specifies the requirements and methods for the acceptance of intelligent substation monitoring systems. It covers aspects such as system functions, performance indicators, testing procedures, and quality control measures. The content provides guidance on the verification of key parameters, the evaluation of system reliability, and the documentation needed for successful project completion. It also includes detailed descriptions of the acceptance criteria for various components of the monitoring system, ensuring consistency and compliance with established technical standards. The document is intended to support the implementation of reliable and efficient monitoring systems within the specified application areas.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of DL/T 1879-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26