Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
maintenance supervision specification chief supervision engineer responsibility system h point quality control point set supervision plan mandatory on-site supervision s/h point steam turbine maintenance utilization results soil monitoring scopethis standard construction platforms
DL/T 1966-2019 in English

DL/T 1966-2019 in English

VALID

Maintenance supervision specification for unit of thermal power plant

  • Issued on:2019-06-04
  • Implemented on:2019-10-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $630.00
$612.00


Introduction

Analysis of the core content of the standard

Core chapters Key technical points Control level
Project supervision organization A registered equipment supervisor is required to implement the chief supervision engineer responsibility system H point
Quality control point Set up four types of control points S/H/W/R (on-site supervision/stop work for inspection/witness/document) S/H point
Steam turbine maintenance The axial clearance of the high-pressure cylinder assembly needs to be measured (≤0.05mm) Point W

Key technical requirements

Typical control case: Adjustment of the clearance of the steam shaft seal of the high-pressure cylinder requires double verification:

  1. Lead wire measurement (S point mandatory on-site supervision)
  2. Re-measurement with dial indicator (H point cannot be crossed)

Standard allowable deviation: radial clearance ±0.03mm, axial expansion clearance ≥2mm


Implementation suggestions

1. Preparation of supervision plan should include:

  • Special control plan for steam turbine/generator based on Appendix A
  • Make a monitoring plan according to Appendix B (e.g., high-pressure rotor must be pumped out at S point)

2. Document management According to the requirements of Appendix E:

  • Retain the original of the daily supervision report (for long-term archiving)
  • Electronic archiving of non-conformity reports

Sample only — not a preview of DL/T 1966-2019
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL/T 5267-2012 in English

    DL/T 5267-2012 in English

    Specification of overburden grouting for hydropower and water resources projects

    2012-01-04