Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
power transformer power cable introduction technical background power transformers power cables complex combination machine handles basic orange high performance liquid chromatography method scopethis standard standard core framework architecture level core components
DL/T 2008-2019 in English

DL/T 2008-2019 in English

VALID

The field testing procedure for complex combination of power transformer, GIS and power cable

  • Issued on:2019-06-04
  • Implemented on:2019-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $250.00
$243.00
Standard No: DL/T 2008-2019
Document status: VALID
Title in English: The field testing procedure for complex combination of power transformer, GIS and power cable
Title in Chinese: 电力变压器、封闭式组合电器、电力电缆复合式连接现场试验方法
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2019-06-04
Implemented on: 2019-10-01
Professional Classification: DL-Electricity
Related Keywords: power transformer
power cable introduction technical background
power transformers
power cables
complex combination
Related Topics: Electrical test methods for power cables iec60885
electric power
Compound
power cable
Yijian Electromechanical Transformer Handover Test Tips
Use a double voltmeter to determine the transformer connection group
Cable test withstand voltage test
iec transformer on-site handover test
Field test methods for composite connections of power transformers, closed combined electrical appliances, and power cables
Connector rated voltage test method
Transformer AC withstand voltage standard
Water bath electroblotting method voltage and current
dl/t2011-2019
dl/t1966-2019
dl/t5784-2019
dl/t5787-2019
dl/t 5786-2019
dl/t 799 -2019
dl/t 5796-2019


Introduction

Technical background and evolution of standards

DL/T 2008-2019 is my country's first special test standard for composite connections of power transformers, enclosed combination appliances and power cables, filling the technical gap in on-site detection of new connection methods such as oil and gas casings and plug-in terminals. Based on the GB 50150 acceptance test specification, this standard focuses on solving the problem of coordinated detection of the interface parts of the three types of equipment.


Comparison of core test items

Test phase Must-do items New featured items Key criteria
Before commissioning Sealing/water content/decomposition product detection AC withstand voltage test of composite connection parts SO2≤1μL/L, H2S≤1μL/L
After operation Insulation resistance/tanδ measurement Winding deformation frequency response analysis tanδ≤130% of initial value

Detailed explanation of key test methods

1. Composite connection sealing test

Use local bandaging method and leak detector for double detection:

  • The sensitivity of the leak detector must reach 1×10-6 (volume ratio)
  • Measurement is carried out after inflation for 24 hours
  • Typical leakage rate ≤0.5%/year (GB 8905)

2. AC withstand voltage test

Adopt the minimum withstand voltage of the equipment principle:

Example: When a transformer (72kV/5min) is connected to a cable (65kV/60min), the test parameter is 65kV/5min


Implementation recommendations

  1. Standardization of test positions: It is recommended to fix the test point at the grounding switch ES1 (Appendix A.1)
  2. Data comparability: The winding deformation test needs to maintain the same wiring method
  3. Safety protection: DS1 must be disconnected and ES2 must be closed during the withstand voltage test

Technology development prospects

This standard provides a basic framework for the integrated detection of future smart substation equipment. The following needs to be supplemented in the future:

  • Partial discharge online monitoring interface specification
  • SF6/oil interface status assessment method
  • High-frequency impedance detection technology

Sample only — not a preview of DL/T 2008-2019
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26