DL/T 399-2010 in English
SUPERSEDEDSupervision guide for main electric equipments of ±800kV and under DC transmission projects
- Issued on:2010-05-01
- Implemented on:2010-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$873.00
本标准适用于指导直流输电工程换流站用主要设备-晶闸管环流阀、环流变压器、平波电抗器以及直流控制保护系统等的全过程设备监理工作,对监理工作总则、范围、依据,委托程序以及工作实施细则做了规定。
Scope
This standard stipulates the minimum requirements to ensure the implementation of supervision work. It does not specify all details, nor does it fully quote the provisions of relevant standards and specifications. Supervision units should provide high-quality services that comply with this standard and higher standards. For more special requirements of certain projects, further research and determination can be made on the basis of this standard according to specific specifications. This standard is applicable to guide the whole-process equipment supervision of the main equipment used in converter stations of DC transmission projects - thyristor converter valves, converter transformers, smoothing reactors (dry type and oil-immersed), and DC control and protection systems. The general principles, scope, basis, entrustment procedures and work implementation details of the supervision work are stipulated.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL/T 646-1998 in English
Technical specification of manufacturing steel transmission pole structures
1998-03-19