DL/T 5035-2016 in English
VALIDTechnical Code for Heating Ventilation and Air Conditioning Design of Fossil Fuel Power Plant
- Issued on:2016-08-16
- Implemented on:2016-12-01
- File Format:PDF
- Delivery:Via email within 10 business days
Price(USD):
$1,720.00
$1,669.00
$1,669.00
Introduction
This standard provides guidelines for the design of heating, ventilation, and air conditioning systems in power generation plants. It covers the principles and methods for ensuring efficient and safe operation of these systems. The document includes requirements for system layout, equipment selection, and performance evaluation. It also addresses the integration of these systems with the overall plant design. The standard outlines procedures for energy efficiency optimization and environmental protection. Additionally, it specifies criteria for system maintenance and operational management. The content is structured to support the planning and implementation phases of power generation projects.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of DL/T 5035-2016

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL 5073-1997 in English
Code for seismic design of hydraulic structures
1997-08-04