DL/T 5198-2013 in English
VALIDCode for the Construction of Crane Girders Anchored To Rock Face for Hydropower and Water Resources Projects
- Issued on:2013-03-07
- Implemented on:2013-08-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$233.00
Scope
This procedure is applicable to the construction of underground powerhouses, main transformer rooms, tailrace gate rooms and other underground cavern rock wall beams in hydropower and water conservancy projects.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 5113.14-2018 in English
Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering Part 14:Concrete face rockfill dam project
2018-04-03 -

DL/T 5761-2018 in English
Techinical specification for constrcution of hyfraulic concrete interface bonding agent
2018-04-03 -

DL/T 5251-2010 in English
Technical code for detection and evaluation of hydraulic concrete structure
2010-05-01 -

DL/T 5389-2007 in English
Construction technical specifications on rock-foundation excavating engineering of hydraulic structures
2007-07-20 -

DL/T 5262-2010 in English
Operation code of safety for construction equipment of hydroelectric and hydraulic engineering - Bulidozer
2011-01-09 -

DL/T 5401-2007 in English
Instrument allocation guide for electrical test of hydropower plant
2007-12-03 -

DL/T 5215-2005 in English
Specification for waterstop of hydraulic structure
2005-02-14 -

DL/T 5237-2010 in English
Technical guide for grouting recorder
2010-05-01 -

DL/T 5255-2010 in English
Technical specification of slope construction for hydropower and water conservancy project
2011-01-09 -

DL/T 5416-2009 in English
Specification of strong motion safety monitoring for bydraulic structures
2009-07-22