DL/T 5215-2005 in English
VALIDSpecification for waterstop of hydraulic structure
- Issued on:2005-02-14
- Implemented on:2005-06-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$418.00
| Standard No: | DL/T 5215-2005 |
| Document status: | VALID |
| Title in English: | Specification for waterstop of hydraulic structure |
| Title in Chinese: | 水工建筑物止水带技术规范 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2005-02-14 |
| Implemented on: | 2005-06-01 |
| ICS Classification: | 27.140-Hydraulic energy engineering |
| Chinese Classification: | P59-Water power engineering |
| Professional Classification: | DL-Electricity |
| Related Keywords: | hydraulic structure scopethis standard
permanent hydraulic structures face rockfill dams other hydraulic structures concrete arch dams |
| Related Topics: | Waterstop
dl/t954-2005 DL T954 2005 DL+T954+2005 dl/t5215-2005 hydraulic structures stop water Waterstop detection cycle hose plumber water stop belt Waterstop 2023 Waterstop detection Scrapped hydraulic construction of hydropower station dl/t5215-2023 |
本标准规定了止水带的型式、尺寸、材质和施工要求。
本标准适用于水电水利枢纽工程中1、2、3 级和坝高70m以上的4、5级混凝土拱坝、重力坝、面板坝及溢洪道、厂房、水闸、隧洞、渡槽等工程,其他混凝土坝、面板坝及永久水工建筑物可参照使用。对于坝高200m 以上的混凝土面板堆石坝或有特殊要求的混凝土坝、面板堆石坝及其他水工建筑物,其止水带型式、尺寸、材质和施工,应进行专门研究。
Scope
This standard specifies the type, size, material and construction requirements of waterstops. This standard applies to level 1, 2, 3 and level 4 and 5 concrete arch dams, gravity dams, face dams and spillways, workshops, sluices, tunnels, aqueducts and other projects in hydropower and water conservancy projects with a dam height of more than 70m. Other concrete dams , face dams and permanent hydraulic structures can be used as a reference. For concrete face rockfill dams with a dam height of more than 200m or concrete dams with special requirements, face rockfill dams and other hydraulic structures, special research should be conducted on the type, size, material and construction of the waterstop.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 5761-2018 in English
Techinical specification for constrcution of hyfraulic concrete interface bonding agent
2018-04-03 -

DL/T 5198-2013 in English
Code for the Construction of Crane Girders Anchored To Rock Face for Hydropower and Water Resources Projects
2013-03-07 -

DL/T 5389-2007 in English
Construction technical specifications on rock-foundation excavating engineering of hydraulic structures
2007-07-20 -

DL/T 5237-2010 in English
Technical guide for grouting recorder
2010-05-01 -

DL/T 5113.14-2018 in English
Quality grade evaluation standard of unit engineering for hydropower and water conservancy construction engineering Part 14:Concrete face rockfill dam project
2018-04-03