Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
hvdc earth return operation system introductionthis standard ground return systems design process technical rule system configuration gas background observations conventional rt-pcr detection cdma digital cellular mobile telecommunication network — csim application characteristics
DL/T 5224-2014 in English

DL/T 5224-2014 in English

VALID

Technical Rule for the Design of HVDC Earth Return Operation System

  • Issued on:2014-06-29
  • Implemented on:2014-11-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $1,710.00
$1,659.00
Standard No: DL/T 5224-2014
Document status: VALID
Title in English: Technical Rule for the Design of HVDC Earth Return Operation System
Title in Chinese: 高压直流输电大地返回系统设计技术规范
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2014-06-29
Implemented on: 2014-11-01
Superseding: DL/T 5224-2005 Technical rule for the design of HVDC earth return operation system
Professional Classification: DL-Electricity
Related Keywords: hvdc earth return operation system introductionthis standard
ground return systems
design process
technical rule
system configuration
Related Topics: gbt 5224 2014
yb/t 5224-2014
gb/t 5224-2014
Gauge flow pressure
Gauge flow pressure
GB T5224 2014
Two 5224
Technical specification for design of HVDC overhead transmission lines
Technical specification for DC lighting system
Dl 5224
GB5224
Why is there voltage but no current?
The whole process of SIS system design
dl/t 5224-2014 High-voltage DC transmission earth return system design technology
High voltage motor overhaul technology


Introduction

This standard provides detailed guidelines for the design of ground return systems in high-voltage direct current transmission projects. It covers essential aspects such as system configuration, material selection, and installation requirements to ensure the safe and efficient operation of these systems. The document outlines specific technical criteria and practices that are crucial for the planning and implementation phases of such projects. It also includes recommendations for testing and maintenance procedures to support long-term reliability. The content is structured to assist engineers and planners in making informed decisions during the design process. Additionally, it addresses environmental and safety considerations relevant to the deployment of ground return systems in high-voltage direct current transmission networks.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of DL/T 5224-2014
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL/T 1483-2015 in English

    DL/T 1483-2015 in English

    Standard Test Method for Chemical and Physical Properties of Limestone—Gypsum Wet Flue Gas Desulfurization Systems

    2015-07-01