Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
feasibility study report fossil fuel power plant feasibility report power plant construction power plant space object orbit other biomass gas ignition engines modification rocket system introduction standard background
DL/T 5375-2008 in English

DL/T 5375-2008 in English

SUPERSEDED

Regulation for content and depth of feasibility study report of fossil fuel power plant

  • Issued on:2008-06-04
  • Implemented on:2008-11-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $300.00
$291.00
Standard No: DL/T 5375-2008
Document status: SUPERSEDED
Superseded by: DL/T 5375-2018 Regulations for content and depth of feasibility study report of fossil-fuel power plant
Superseded on: 2018-10-01
Title in English: Regulation for content and depth of feasibility study report of fossil fuel power plant
Title in Chinese: 火力发电厂可行性研究报告内容深度规定
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2008-06-04
Implemented on: 2008-11-01
ICS Classification: 27.100-Power stations in general
Chinese Classification: P61-Power station engineering
Professional Classification: DL-Electricity
Related Keywords: feasibility study report
fossil fuel power plant
feasibility report
power plant construction
power plant
Related Topics: firepower
Refractoriness Test Report
dl/t 5375
power plant
research report
sex studies
The main research content of this paper:
The main research content of this paper:
Research content of this article
3. Research content of this paper
Research content of this paper:
The main research content of this paper
2. Research content and
Content of report
The main content of this research
19. Main contents of the report
feasibility
research report
thermal power plant
feasibility study
Main research content
feasibility study
dl/t5375
The main research content of this paper
How much research content
The main content of this research
The main research content of this paper:
time study
Research content of this article
Research content of this article
The main content of this research:
The content of this study
2. Research content of this paper
1. Main research content
main research content
3. Research content
System research content
Research work content
For the research content of this paper
action content
research content work
work study content
14th Five-Year Research Report
depth power
Volatility Report
Main research technical content
Industry Research Report
feasibility study
Power Depth Regulations
content depth
In-depth regulations on the content of feasibility study reports for thermal power plants
ELISA research report template
Brain-like intelligence research content
Domestic automobile R&D temperature determination
Preparation of feasibility study report for coal preparation plant


1 Scope

This standard specifies the basic work content, compilation depth and procedure of feasibility study report (hereinafter referred to as feasibility report) of fossil fuel power plant (hereinafter referred to as power plant).
This standard is applicable to newly-built, expanded or rebuilt engineering projects of power plant.

2 Normative References

The following documents contain provisions which, through reference in this text, constitute provisions of this standard. For dated reference, subsequent amendments to (excluding any corrigendum), or revisions of, any of these publications do not apply. However, parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below. For any undated references, the latest edition of the document referred to applies.
GB 18306 Seismic Ground Motion Parameters Zonation Map of China
DL 5000 Technical Code for Designing Fossil Fuel Power Plants
DL/T 5084 Technical Code of Hydrology for Electrical Power Projects
DL/T 5158 Technical Code of Meteorological Surveying for Electrical Power Projects

3 General Provisions

3.0.1 According to the national current laws & regulations, policies and capital construction procedure requirements and in combination with the characteristics of power plant project construction, this standard is specially prepared with a view to carry out national laws & regulations and industrial policies, capital construction procedure and guidelines in power plant construction and standardize the content and depth of preliminary work of power plant.
3.0.2 Feasibility study is an important stage in capital construction procedure, as it will provide scientific basis for project decision. Feasibility study shall be conducted for newly-built, expanded or rebuilt project of power plant and feasibility report shall be prepared. Feasibility report is the basis for preparing project application report and the reference for making investment decision by project organization. This standard is the important basis for the content and depth of prepared feasibility report of power plant.
3.0.3 Power plant project construction shall comply with the national policy of building resource-saving and environment-friendly society and actively adopt reliable and advanced technology as well as actively recommend and adopt high-efficient, energy-saving, land-saving, water-saving, material-saving, consumption-reducing and environmental-friendly scheme in feasibility study stage.
3.0.4 The preparation of feasibility report shall be in accordance with the power system development planning in recent period and based on authorized prefeasibility study report. The project organization shall entrust the organization with corresponding qualification to prepare feasibility report.
3.0.5 For the project that is not approved after the completion of feasibility report preparation for 3 years, it shall be subject to overall reexamination and adjustment, and supplementary feasibility report shall be prepared.
3.0.6 In preparing feasibility report, the design organization must master the original information and basic data of the design comprehensively, accurately and fully. The project organization shall acquire relevant competent department's commitment documents as required and sign relevant agreements with relevant departments. The content of signed agreements or documents must be accurate and complete. The design organization shall cooperate with the project organization to do work.
3.0.7 If multiple design organizations take part in the preparation of feasibility report, one principal design organization shall be designated. The principal design organization shall be responsible for the correctness of original information provided for other participating organizations, the cooperation, coordination and jurisdiction of relevant works, as well as the induction of the adaptability of main contents and conclusive opinions of outsourced single-item feasibility report or experimental study report and the like after confirmation into feasibility report.

Foreword i
1 Scope
2 Normative References
3 General Provisions
4 Content and Depth of Feasibility Study Report
4.1 Overview
4.2 Power System
4.3 Thermal Load Analysis
4.4 Fuel Supply
4.5 Plant Site Condition
4.6 Project Assumption
4.7 Flue Gas Desulfurization and Denitration
4.8 Environment and Ecological Protection as well as Water and Soil Conservation
4.9 Comprehensive Utilization
4.10 Labor Safety
4.11 Occupational Health
4.12 Resource Utilization
4.13 Energy-saving Analysis
4.14 Human Resource Allocation
4.15 Condition, Construction Schedule and Construction Period of Project Implementation
4.16 Investment Estimation and Financial Analysis
4.17 Risk Analysis
4.18 Economic and Social Impact Analysis
4.19 Conclusion and Suggestion
5 Attachments of Feasibility Study Report
6 Attached Diagrams (Drawings) of Feasibility Study Report

Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.