Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
feasibility study report power plant thermal power plant power plant construction fossil-fuel power plant scopethis standard auricular wide-temperature catenary steel
DL/T 5375-2018 in English

DL/T 5375-2018 in English

VALID

Regulations for content and depth of feasibility study report of fossil-fuel power plant

  • Issued on:2018-06-06
  • Implemented on:2018-10-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $1,460.00
$1,417.00
Standard No: DL/T 5375-2018
Document status: VALID
Title in English: Regulations for content and depth of feasibility study report of fossil-fuel power plant
Title in Chinese: 火力发电厂可行性研究报告内容深度规定
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 2018-06-06
Implemented on: 2018-10-01
Superseding: DL/T 5375-2008 Regulation for content and depth of feasibility study report of fossil fuel power plant
Professional Classification: DL-Electricity
Related Keywords: feasibility study report
power plant
thermal power plant
power plant construction
fossil-fuel power plant scopethis standard
Related Topics: firepower
Refractoriness Test Report
dl/t 5375
research report
sex studies
The main research content of this paper:
The main research content of this paper:
Research content of this article
3. Research content of this paper
Research content of this paper:
The main research content of this paper
2. Research content and
Content of report
The main content of this research
19. Main contents of the report
feasibility
research report
thermal power plant
feasibility study
Main research content
feasibility study
dl/t5375
The main research content of this paper
How much research content
The main content of this research
The main research content of this paper:
time study
Research content of this article
Research content of this article
The main content of this research:
The content of this study
2. Research content of this paper
1. Main research content
Senior Special Studies
main research content
3. Research content
System research content
Research work content
For the research content of this paper
action content
research content work
work study content
14th Five-Year Research Report
depth power
Volatility Report
Main research technical content
Industry Research Report
feasibility study
Power Depth Regulations
content depth
In-depth regulations on the content of feasibility study reports for thermal power plants
ELISA research report template
Brain-like intelligence research content
Domestic automobile R&D temperature determination
Preparation of feasibility study report for coal preparation plant
dl/t 5375-2018


Scope

This standard specifies the basic work content, preparation attempts and procedures for preparing a feasibility study report (hereinafter referred to as a feasibility study report) for a thermal power plant (hereinafter referred to as a power plant). This standard applies to power plant construction, expansion or reconstruction projects.

Sample only — not a preview of DL/T 5375-2018
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL/T 790.11-2001 in English

    DL/T 790.11-2001 in English

    Distribution Automation Using Distribution Line Carriers Part 1: General Part 1: Architecture of Distribution Automation Systems

    2001-12-26
  • DL/T 1310-2022 in English

    DL/T 1310-2022 in English

    Swivel joint for overhead transmission line

    2022-05-13