DL/T 5375-2018 in English
VALIDRegulations for content and depth of feasibility study report of fossil-fuel power plant
- Issued on:2018-06-06
- Implemented on:2018-10-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$1,417.00
Scope
This standard specifies the basic work content, preparation attempts and procedures for preparing a feasibility study report (hereinafter referred to as a feasibility study report) for a thermal power plant (hereinafter referred to as a power plant). This standard applies to power plant construction, expansion or reconstruction projects.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL/T 790.11-2001 in English
Distribution Automation Using Distribution Line Carriers Part 1: General Part 1: Architecture of Distribution Automation Systems
2001-12-26 -

DL/T 1310-2022 in English
Swivel joint for overhead transmission line
2022-05-13