DL/T 5376-2007 in English
SUPERSEDEDSpecifications for drawing-up of boundary line of land requisition and treatment of hydroelectric project
- Issued on:2007-07-20
- Implemented on:2007-12-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$180.00
$175.00
$175.00
建设片地处理范围界定是水电工程移民安置规划设计的重要内容。《水电工程建设征地处理范围界定规范》在《水电工程建设征地移民安置规划设计规范》规定的总体设计内容、深度、原则和程序的基础上,就建设征地处理的范围、程序、深度、方法等有关设计原则和技术标准做了详细规定,以便更好地完成建设征地处理范围的界定。
Scope
This standard specifies the principles, scope, procedures, depth and methods of land acquisition for hydropower project construction. This standard is applicable to the scope definition of construction land acquisition during the pre-feasibility study report, feasibility study report and resettlement implementation of large and medium-sized hydropower projects (including pumped storage power stations).
Sample only — not a preview of DL/T 5376-2007

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.