VALIDSpecification for commissioning and quality acceptance and evaluation of flue gas desulphurization for coal-fired power plant
- Issued on:2007-12-03
- Implemented on:2008-06-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$1,368.00
| Standard No: | DL/T 5403-2007 |
| Document status: | VALID |
| Title in English: | Specification for commissioning and quality acceptance and evaluation of flue gas desulphurization for coal-fired power plant |
| Title in Chinese: | 火电厂烟气脱硫工程调整试运及质量验收评定规程 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2007-12-03 |
| Implemented on: | 2008-06-01 |
| ICS Classification: | 27.100-Power stations in general |
| Chinese Classification: | F22-Electric power system equipment installation testing |
| Professional Classification: | DL-Electricity |
| Related Keywords: | quality acceptance assessment
quality acceptance flue gas desulphurization limestone wet flue gas desulfurization projects coal-fired power plant scopethis standard |
| Related Topics: | dl/t 571-2007
thermal power plant Quality acceptance criteria Flue gas debugging Quality acceptance Quality acceptance Quality acceptance and assessment of power substation projects dl/t5017-2007 dl/t5395-2007 dl/t 5383-2007 |
本标准规定了火电厂石灰石石湿法烟气脱硫工程启动调试、试运和质量验收评定所遵循的标准和要求。
本标准适用于新建、扩建和改建火电厂石灰石湿法烟气脱硫工程的启动调试、试运、验收评定工作。其他脱硫技术工程的启动调试、试运和质量验收评定可参照执行。
Scope
This standard specifies the standards and requirements for the start-up, commissioning, trial operation and quality acceptance assessment of limestone wet flue gas desulfurization projects in thermal power plants. This standard applies to the start-up, commissioning, trial operation, acceptance and assessment of limestone wet flue gas desulfurization projects in newly built, expanded and renovated thermal power plants. The start-up, commissioning, trial operation and quality acceptance assessment of other desulfurization technology projects can be implemented as a reference.

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 782-2001 in English
Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above
2001-10-08 -

DL/T 812-2002 in English
Insulators string for overhead lines with a normal voltage above 1000V-AC power arc test method
2002-04-27