Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
completion acceptance start-up acceptance power transmission new power transmission distribution project electrical insulating shoes encarsia formosa light bamboo shoots
DL/T 782-2001 in English

DL/T 782-2001 in English

VALID

Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above

  • Issued on:2001-10-08
  • Implemented on:2002-02-01
  • File Format:PDF
  • Delivery:Via email within 5 business days
Price(USD): $330.00
$321.00
Standard No: DL/T 782-2001
Document status: VALID
Title in English: Code of start-up & completion acceptance for power transmission & distribution project of 110kV and above
Title in Chinese: 110kV及以上送变电工程启动及竣工验收规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 5 business days
Issued on: 2001-10-08
Implemented on: 2002-02-01
ICS Classification: 27.100-Power stations in general
Chinese Classification: F22-Electric power system equipment installation testing
Professional Classification: DL-Electricity
Related Keywords: completion acceptance
start-up acceptance
power transmission
new power transmission
distribution project
Related Topics: substation
start up
completed
Substation project
Substation project
t project
start
Initiate acceptance procedures
Completion acceptance
Quality acceptance and assessment of power substation projects
Chromatography acceptance process and
dl/t782-2023
t/cec 782
Completion acceptance of electrolytic aluminum project

本规程适用于110kV及以上的各类新建送变电工程的启动及竣工验收。规模很小的工程和110kV以下送变电工程的启动验收可参照执行。国外成套设备进口的工程还应接合同的规定进行启动及竣工验收。


Scope

This procedure applies to the start-up and completion acceptance of all types of new power transmission and transformation projects of 110kV and above. The start-up acceptance of small-scale projects and power transmission and transformation projects below 110kV can be implemented as a reference. Projects for imported complete sets of equipment from abroad should also be started and completed for acceptance in accordance with the provisions of the contract.

Sample only — not a preview of DL/T 782-2001
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 5403-2007 in English

    DL/T 5403-2007 in English

    Specification for commissioning and quality acceptance and evaluation of flue gas desulphurization for coal-fired power plant

    2007-12-03
  • DL/T 812-2002 in English

    DL/T 812-2002 in English

    Insulators string for overhead lines with a normal voltage above 1000V-AC power arc test method

    2002-04-27
  • DL/T 851-2004 in English

    DL/T 851-2004 in English

    Acceptance tests for combined-cycle power plants

    2004-03-09