Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
pulverized coal preparation system power plant introductionthis standard thermal power plants design requirements coal-fired power generation stations electronic industry-propylene introduction celestite pine products
DL/T 5581-2020 in English

DL/T 5581-2020 in English

VALID

Code for design of pulverized coal preparation system of power plant

  • Issued on:2020-10-23
  • Implemented on:2021-02-01
  • File Format:PDF
  • Delivery:Via email within 10 business days
Price(USD): $1,470.00
$1,426.00
Standard No: DL/T 5581-2020
Document status: VALID
Title in English: Code for design of pulverized coal preparation system of power plant
Title in Chinese: 火力发电厂制粉系统设计规程
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 10 business days
Issued on: 2020-10-23
Implemented on: 2021-02-01
Professional Classification: DL-Electricity
Related Keywords: pulverized coal preparation system
power plant introductionthis standard
thermal power plants
design requirements
coal-fired power generation stations
Related Topics: thermal power plant
Technical specification for design and calculation of combustion system in thermal power plant
Design of large and medium thermal power plants
System Design Procedure
Electronic version of terminology specification for power system planning and design
dl/t5572-2020
Aluminum powder design
dl/t 5581-2020
dl/t 5581-2012
dl/t2131-2020


Introduction

This standard specifies the design requirements for coal grinding systems in thermal power plants. It outlines detailed guidelines for system configuration, equipment selection, and safety measures to ensure efficient and reliable operation of coal grinding facilities. The document is intended for use by engineers and designers involved in planning and constructing new or modifying existing coal-fired power generation stations.

*** Please note: This description may not be accurate, please refer to the official documentation.

Sample only — not a preview of DL/T 5581-2020
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26
  • DL 483-1992 in English

    DL 483-1992 in English

    Technical conditions for static recloser device

    1992-07-02