Sign In |Help & Support
ALL SECTORS
  • ALL SECTORS
  • GB(National Standard)
  • CB(Shipping)
  • CECS(Engineering Construction)
  • CJ(Urban Construction)
  • CY(News and Publication)
  • DB(Provincial Standard)
  • DL(Electricity & Power)
  • DZ(Geology & Mineralogy)
  • FZ(Spinning & Textile)
  • GA(Public Security)
  • HB(Aviation)
  • HG(Chemical Industry)
  • HJ(Environmental Protection)
  • JB(Machinery)
  • JC(Building Materials)
  • JG(Building & Construction)
  • JJ(Metering)
  • JT(Highway & Transportation)
  • LY(Forestry)
  • MT(Coal)
  • NB(Energy)
  • NY(Agriculture)
  • QB(Light Industry)
  • QC(Automobile & Vehicle)
  • QJ(Aerospace)
  • SH(Petrochemical)
  • SJ(Electronics)
  • SL(Water Resources)
  • SN(Commodity Inspection)
  • SY(Oil & Gas)
  • TB(Railway & Train)
  • YB(Ferrous Metallurgy)
  • YC(Tobacco)
  • YD(Telecommunication)
  • YY(Medical Device)
Database: 365,228(8 Aug 2026)
chemical water thermal power plants thermal power plant selection steam power plant thermal power plant chief engineer rural homestay railway locomotive facilities introductionthis document quantitative test reagent scopethis standard
DL/T 561-1995 in English

DL/T 561-1995 in English

SUPERSEDED

Guide for Chemical Supervision of Water and Steam in Thermal Power Plants

  • Issued on:1995-03-06
  • Implemented on:1995-08-01
  • File Format:PDF
  • Delivery:Via email within 1~3 business days
Price(USD): $200.00
$194.00
Standard No: DL/T 561-1995
Document status: SUPERSEDED
Superseded by: DL/T 561-2013 Guide for Chemical Supervision of Water and Steam in Thermal Power Plant
Superseded on: 2014-04-01
Title in English: Guide for Chemical Supervision of Water and Steam in Thermal Power Plants
Title in Chinese: 火力发电厂水汽化学监督导则
Language: English
File Format: Electronic (PDF)
Delivery: Via email within 1~3 business days
Issued on: 1995-03-06
Implemented on: 1995-08-01
Professional Classification: DL-Electricity
Related Keywords: chemical water
thermal power plants
thermal power plant selection
steam power plant
thermal power plant chief engineer
Related Topics: water vapor
Supervision instrument
dl/t576-1995
Electrochemical conductivity
chemical conductivity
power plant chemistry
Strengthen supervision and re-supervision
Supervisory taste
water chemistry
supervision of re-supervision
thermal power plant
Supervise English
power plant water
Conductivity Electrochemistry
Guidelines for Water Vapor Chemistry Supervision in Thermal Power Plants
Chemical plant ventilation
electrochemistry
Thermal power plant water
Thermal power generation supervision


1.1 The power plant's steam generation equipment, chemical monitoring is to ensure the security, economic, and stable operation of one of the important part. To meet the high-parameter, large-capacity thermal power needs of rapid development, especially development of the guidelines.
1.2 In order to prevent quality deterioration caused by water and steam equipment accidents, we must implement the "prevention first, quality first" approach, do a good job monitoring the whole process of chemical water and steam quality management. New thermal power plant selection from the water, water treatment system design, equipment and materials selection, installation and commissioning, up to equipment operation, maintenance and deactivation should adhere to quality standards at all stages to ensure the quality of 100% of the water and steamline This guide provides the standard value, ensure that equipment is not due to thermal corrosion, fouling, salt accumulation and accidents.
1.3 The power control (power) the leadership of Council Chief Engineer Chemical monitoring the whole process of quality management. Chief Engineer and chemical professional engineer should always understand and grasp the overall situation of the chemical monitoring, coordination and implementation of the chemical monitoring of the relevant work experiences, and continuously improve the level of the chemical monitoring.
1.4 Thermal Power Plant construction period of the chemical monitoring should be undertaken by Power Construction Company (Board) is responsible for organization and implementation. The supervision must be included in the progress of its implementation should be used as a basis for assessing the quality of works.
1.5 Thermal Power Plant Chief Engineer shall organize and lead steam turbine, boiler, electrical, thermal control, chemical professionals and long-run value of thermal equipment to study the corrosion and scaling problems, analyze the causes, clear division of labor, to implement measures to continuously improve the equipment health, to prevent accidents.
1.6 Chemical water and steam power plant to supervise the work well, we must give full play to the chemical responsible for personnel oversight. Chemical personnel should be responsible for timely and accurate detection of water and steam quality and heat the whole factory equipment corrosion, fouling, salt accumulation level. Abnormal, the leading power plant should be a written report, analyze the causes and make recommendations as a preventive measure. Chemistry should be a dedicated team under the leadership of Chief Engineer, supervision, inspection departments to realize such corrosion, scale measures, so that the quality of water and steam back to normal. When necessary, the chemical responsible for a written staff report can also copy to electronic tubes (Electricity) Board.

1 General Provisions
2 Design Stage
3 Installation and Debugging Stage
4 Running Phase
5 Inspection and Repair, Stages of Shutting Down and Standby
6 Technocracy

Sample only — not a preview of DL/T 561-1995
Page: 1 / 0
100%

Loading PDF document...

Error loading PDF. Please make sure the file is valid and try again.

We also recommend

  • DL/T 1384-2023 in English

    DL/T 1384-2023 in English

    Credit evaluation index system classification and codes of power enterprise suppliers

    2023-05-26
  • DL/T 790.12-2001 in English

    DL/T 790.12-2001 in English

    Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications

    2001-12-26