DL/T 567.3-2016 in English
VALIDTest methods of fuel in thermal power plants Part 3:Sampling and preparation for fly ash and bottom ash
- Issued on:2016-12-05
- Implemented on:2017-05-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
Price(USD):
$170.00
$165.00
$165.00
| Standard No: | DL/T 567.3-2016 |
| Document status: | VALID |
| Title in English: | Test methods of fuel in thermal power plants Part 3:Sampling and preparation for fly ash and bottom ash |
| Title in Chinese: | 火力发电厂燃料试验方法 第 3 部分:飞灰和炉渣样品的采取和制备 |
| Language: | English |
| File Format: | Electronic (PDF) |
| Delivery: | Via email within 1~3 business days |
| Issued on: | 2016-12-05 |
| Implemented on: | 2017-05-01 |
| Superseding: |
DL/T 567.3-1995 Methods for Collection of Fly Ash and Cinder Samples
DL/T 567.4-1995 Preparation of Samples for Coal as Fired Pulverized Coal as Fired Fly Ash and Cinder DL/T 926-2005 Method of automatic fly-ash sampling |
| Professional Classification: | DL-Electricity |
| Related Keywords: | fly ash
thermal power plants coal-fired power plants bottom ash introductionthis standard test methods |
| Related Topics: | Power plant sample preparation equipment
Ash furnace Food factory incoming materials, process, and finished product sampling methods Slag sampling |
Introduction
This standard specifies the methods for sampling and preparation of fly ash and slag samples in coal-fired power plants. It covers the procedures for collecting representative samples from different locations within the plant, as well as the steps involved in processing these samples to ensure consistency and accuracy. The guidelines provided are intended to support reliable testing and analysis of fly ash and slag, which are by-products of coal combustion. The document outlines the tools, equipment, and techniques required for proper sampling and preparation, ensuring that the samples obtained are suitable for further testing and evaluation. It also includes details on the storage and handling of samples to maintain their integrity until testing is completed. The standard is applicable to all coal-fired power plants and related facilities where the collection and preparation of fly ash and slag samples are necessary.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of DL/T 567.3-2016

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL/T 790.11-2001 in English
Distribution Automation Using Distribution Line Carriers Part 1: General Part 1: Architecture of Distribution Automation Systems
2001-12-26 -

DL 5073-1997 in English
Code for seismic design of hydraulic structures
1997-08-04