DL/T 5724-2015 in English
VALIDTechnical Specifications for Wastewater Treating about Aggregate System of Hydropower Project
- Issued on:2015-04-02
- Implemented on:2015-09-01
- File Format:PDF
- Delivery:Via email within 1~3 business days
$873.00
Introduction
Analysis of the core content of the standard
This standard proposes the gradual treatment principle for the treatment of wastewater from the sand and gravel system of hydropower projects, and clearly requires that the SS concentration after treatment is ≤70mg/L, and focuses on standardizing the following technical links:
| Treatment link | Key technical parameters | Equipment selection requirements |
|---|---|---|
| Pretreatment | Flow rate 0.025-0.05m/s, residence time ≥300s | Sand settling tank/chain plate scraper/hydraulic cyclone |
| Coagulation and sedimentation | Polyacrylamide dosage 5-20%, GT value 1500-2000 | Radial flow sedimentation tank with a diameter of >20m requires a peripheral drive scraper |
| Mechanical dehydration | Sludge concentration time ≥1h, sludge discharge pipe diameter ≥200mm | Filter press is preferred, with a pipeline flow rate of 1.2-1.7m/s |
Key technical points
1. Process selection logic
Differential treatment schemes are adopted according to the suspended matter concentration gradient:
- 20000-50000g/m³: Cyclone purification process is recommended
- 70000-80000g/m³: Polyacrylamide coagulant must be added
- Limited site: Pretreatment + coagulation and sedimentation combined process is adopted
2. Equipment selection specifications
Radial flow sedimentation tank Scraper selection standards:
- Diameter <20m: central drive scraper
- Diameter 20-50m: peripheral drive truss scraper
- Scraper line speed 2.5-5.0m/min
Implementation suggestions
1. Key points of operation and maintenance
- The trial run must complete a 72-hour full load continuous test
- The SS concentration of the effluent water must be tested every shift, and the dosage must be adjusted immediately if abnormal
- Heating and insulation measures must be taken for the pipeline in winter
2. Response to common problems
In response to the blockage of the mud discharge pipe, the standard has mandatory requirements:
- Diameter of the mud discharge pipe ≥ 250mm
- High-pressure water backwashing system
- Pipeline turning radius ≥ 6 times the pipe diameter

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26 -

DL 5073-1997 in English
Code for seismic design of hydraulic structures
1997-08-04 -

DL/T 1553-2016 in English
Regulation of sulfur hexafluoride gas recovery and purification procession
2016-01-07 -

DL/T 646-1998 in English
Technical specification of manufacturing steel transmission pole structures
1998-03-19