DL/T 5741-2016 in English
VALIDTechnical specification for river closure construction of hydroelectric and hydraulic engineering
- Issued on:2016-12-05
- Implemented on:2017-05-01
- File Format:PDF
- Delivery:Via email within 10 business days
Price(USD):
$970.00
$941.00
$941.00
Introduction
This standard provides detailed guidelines for the construction techniques involved in the cutoff process of hydropower engineering projects. It covers various aspects such as planning, implementation, and monitoring to ensure the effectiveness and safety of the construction activities. The document outlines specific procedures and criteria that are essential for achieving the desired outcomes during the cutoff phase. It also includes recommendations for materials, equipment, and operational practices that are relevant to the construction process. The standard is structured to facilitate the application of best practices in the field, ensuring consistency and reliability in the execution of the cutoff operations. It serves as a reference for professionals involved in the planning and execution of such projects.
*** Please note: This description may not be accurate, please refer to the official documentation.
Sample only — not a preview of DL/T 5741-2016

Loading PDF document...
Error loading PDF. Please make sure the file is valid and try again.
We also recommend
-

DL/T 790.12-2001 in English
Distribution Automation Using Distribution Line Carrier Part 1: General Provisions Part 2: Guidelines for Formulation of Specifications
2001-12-26